haku: @journal_id 112 / yhteensä: 1577
viite: 121 / 1577
Tekijä: | Denardo, E. Lee, T. |
Otsikko: | managing uncertainty in a serial production line |
Lehti: | Operations Research
1996 : MAR-APR, VOL. 44:2, p. 382-392 |
Asiasana: | MANAGEMENT UNCERTAINTY |
Kieli: | eng |
Tiivistelmä: | This paper studies a serial production line that is uncertain. The authors introduce a linear model of the uncertainty that can exist in the demand for the product and in each stage's processing time, yield , rework probability, and reliability. The authors construct a linear discrete-time rule for controlling production, and they show that repeated application of this rule leads the system to steady-state conditions, which include closed-form formulas for the mean and variance of each buffer's stock. |
SCIMA