haku: @journal_id 112 / yhteensä: 1577
viite: 36 / 1577
Tekijä:Blocher , J. D.
Chand, S.
Sengupta, K.
Otsikko:The changeover scheduling problem with time and cost consideration: analytical results and a forward algorithm.
Lehti:Operations Research
1999 : JUL-AUG, VOL. 47:4, p. 559-569
Asiasana:Operational research
Algorithms
Kieli:eng
Tiivistelmä:The interest of this paper is on the product-dependent structure, that is the changeover cost/time associated with changing production. The objective is to find a feasible schedule that meets all demand on time and minimizes the total changeover cost.
SCIMA tietueen numero: 198003
lisää koriin
SCIMA