haku: @indexterm just-in-time production / yhteensä: 178
viite: 29 / 178
Tekijä:Kern, G. M.
Wei, J. C.
Otsikko:Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments
Lehti:Decision Sciences
1996 : SPRING, VOL. 27:2, p. 365-387
Asiasana:PRODUCTION PLANNING
SIMULATION
JUST-IN-TIME PRODUCTION
Kieli:eng
Tiivistelmä:This paper describes a simulation experiment to evaluate the relative effectiveness of rescheduling policies in capacity-constrained, just-in-time (JIT) make-to-stock production environments. Three performance measures were analyzed: average finished goods inventory, total units of sales lost, and a measure of schedule instability. Among the three loading methods we studied (level loading, front loading, and back loading), none was superior across all three performance measures. Level loading was the most robust, while back loading had an interaction effect with forecasting model and capacity level.
SCIMA tietueen numero: 164055
lisää koriin
SCIMA