haku: @indexterm JUST-IN-TIME PRODUCTION / yhteensä: 178
viite: 18 / 178
Tekijä: | Miltenburg, J. |
Otsikko: | Balancing U-lines in a multiple U-line facility |
Lehti: | European Journal of Operational Research
1998 : AUG 16, VOL. 109:1, p. 1-23 |
Asiasana: | JUST-IN-TIME PRODUCTION DYNAMIC PROGRAMMING MANUFACTURING |
Kieli: | eng |
Tiivistelmä: | U-shaped production lines and facilities consisting of many such lines are important parts of modern manufacturing systems. The problems of balancing and re-balancing U-line facilities is studied in this paper. Like the traditional line balancing problem this problem is NP-hard. The objective is to assign tasks to a minimum number of regular, crossover, and multiline stations while satisfying cycle time, precedence, location, and station-type constraints. |
SCIMA