haku: @indexterm just-in-time production / yhteensä: 178
viite: 18 / 178
Tekijä:Miltenburg, J.
Otsikko:Balancing U-lines in a multiple U-line facility
Lehti:European Journal of Operational Research
1998 : AUG 16, VOL. 109:1, p. 1-23
Asiasana:JUST-IN-TIME PRODUCTION
DYNAMIC PROGRAMMING
MANUFACTURING
Kieli:eng
Tiivistelmä:U-shaped production lines and facilities consisting of many such lines are important parts of modern manufacturing systems. The problems of balancing and re-balancing U-line facilities is studied in this paper. Like the traditional line balancing problem this problem is NP-hard. The objective is to assign tasks to a minimum number of regular, crossover, and multiline stations while satisfying cycle time, precedence, location, and station-type constraints.
SCIMA tietueen numero: 179950
lisää koriin
SCIMA