haku: @freeterm REIHENFOLGEPROBLEM / yhteensä: 19
viite: 7 / 19
Tekijä:Schmeal, W. R.
Parikh, P. D.
Otsikko:Simulation in evaluation of scheduling policies in composites manufacturing (Mathematisches Modell; Maschinenbelegungsplanung)
Lehti:Industrial Engineering
1993 : NOV, VOL. 25:11, p. 35-38
Asiasana:
Vapaa asiasana:FERTIGUNGSSTEUERUNG, FERTIGUNGSPLANUNG,
REIHENFOLGEPROBLEM
Kieli:eng
Tiivistelmä:An assessment was made of the technology of manufacturing simulation of discrete part manufacturing of a small polymer composites company. Simulation was applied to a new project: fabrication and carpeting of tire covers and seat backs for two automotive models. Capital and materials handling schemes had been determined previously, leaving operating modes and scheduling options as primary systems unknowns. Simulation of the process in operation provided a systems perspective leading to recommendations of operating strategies that were not obvious.
SCIMA tietueen numero: 125232
lisää koriin
SCIMA