Tekijä: | Sharadapriyadarshini, B. Rajendran, C. |
Otsikko: | Formulations and heuristics for scheduling in a buffer constrained flowshop and flowline-based manufacturing cell with different buffer space requirements for job. Part 1 (Maschinenbelegungsplanung; Mathematisches Modell) |
Lehti: | International Journal of Production Research
1996 : DEC, VOL. 34:12, p. 3465-3485 |
Asiasana: | |
Vapaa asiasana: | FERTIGUNGSPROGRAMMPLANUNG, FERTIGUNGSSTEUERUNG |
Kieli: | eng |
Tiivistelmä: | This article in two parts deals with the problem of scheduling in a permutation flowshop and flowline-based manufacturing cell. The authors consider different buffer space requirements for different in-process inventory levels for jobs and constraints on buffer capacity between machines. They propose a generalized formulation of equations for time tabling of jobs in the buffer constrained flowshop. They extend the formulation to address the situation where transport times are separated from process times. |
« edellinen | seuraava »
SCIMA