haku: @indexterm Activity-based costing / yhteensä: 22
viite: 17 / 22
Tekijä:Nachtmann, H.
LaScola Needy, K.
Otsikko:Fuzzy activity based costing: a methodology for handling uncertainty in activity based costing systems
Lehti:Engineering Economist
2001 : VOL. 46:4, p. 245-273
Asiasana:ACTIVITY-BASED COSTING
FUZZY SETS
PHARMACEUTICAL INDUSTRY
UNCERTAINTY
Kieli:eng
Tiivistelmä:Activity based costing (ABC) systems are often developed using estimated input data. A methodology based on fuzzy set theory has been developed to handle estimation imprecision and uncertainty in ABC systems. This methodology creates a new type of ABC system: a fuzzy activity based costing (FABC) system. This paper introduces the concepts behind FABC, discusses the FABC development process and presents a FABC system that was developed for a mid-sized pharmaceutical company.
SCIMA tietueen numero: 229031
lisää koriin
SCIMA