haku: @journal_id 943 / yhteensä: 250
viite: 5 / 250
Tekijä:Merkel, K. G.
Otsikko:Achieving planned performance results using manufacturing operations (betriebliche Produktivität, Fertigungszeiten, Fertigungskontrolle)
Lehti:Industrial Engineering
1995 : APR, VOL. 27:4, p. 26-29
Asiasana:
Vapaa asiasana:FERTIGUNGSMANAGEMENT
Kieli:eng
Tiivistelmä:Achieving planned performance results from manufacturing operations is a primary goal of plant and operations managers. Using a well designed operations management system is one method that can help them reach this goal. Managers need to link planning with control, extend control beyond the basic plant budgeting system, and have access to meaningful productivity data for decision making purposes.
SCIMA tietueen numero: 141137
lisää koriin
SCIMA