Tekijä:Kingsman, B. G.
Tatsiopoulos, I. P.
Hendry, L. C.
Otsikko:A structural methodology for managing manufacturing lead times in make-to-order companies.
Lehti:European Journal of Operational Research
1989 : MAY 25, VOL. 40:2, p. 196-209
Asiasana:PRODUCTION CONTROL
PRODUCTION PLANNING
CONTROL SYSTEMS
JOB-SHOP SCHEDULING
Kieli:eng
Tiivistelmä:A methodology to control manufacturing lead times is developed. Past approaches concentrate on scheduling orders through the shop floor to meet their specified delivery dates. This is clearly sub-optimal since it covers only a part of the total lead time. A higher level approach in which the order book is deliberately moulded into a shape that can be produced profitably, is more appropriate. This should be achieved at the consumer enquiry stage, when prices and delivery dates to be quoted are determined. Hence a structural approach is adopted which includes customer orders planning and job release functions.
SCIMA tietueen numero: 69043
lisää koriin
SCIMA