haku: @journal_id 1007 / yhteensä: 280
viite: 10 / 280
Tekijä:Leschke, J. P.
Otsikko:The setup reduction process. Part 2
Lehti:Production and Inventory Management Journal
1997 : MAR, VOL. 38:1, p. 38-42
Asiasana:
Kieli:eng
Tiivistelmä:The Single Minute Exchange of Die (SMED) methodology is an effective approach to achieving significant reductions in setup time. One aspect of SMED is to emphasize the reduction of those setups which take the longest time. This article, the second in a two-part series , contains the results of a simulation experiment comparing the longest setup time rule with 5 other setup reduction priority rules.
SCIMA tietueen numero: 163484
lisää koriin
SCIMA