haku: @journal_id 1007 / yhteensä: 280
viite: 4 / 280
Tekijä:McFeely, D. J.
Simpson, W. P.
Simons, J. V. Jr.
Otsikko:Scheduling to achieve multiple criteria in an Air Force depot CNC machine shop (Durchlaufzeit; Maschinenbelegungsplanung; Auftragsfertigung)
Lehti:Production and Inventory Management Journal
1997 : MAR, VOL. 38:1, p. 72-79
Asiasana:
Vapaa asiasana:FERTIGUNGSSTEUERUNG, NUMERISCHE
STEUERUNG, FERTIGUNGSPROGRAMMPLANUNG
Kieli:eng
Tiivistelmä:In this study, the performance of alternative loading and sequencing rule combinations in an Air Force depot production shop which employs computer numerical controlled (CNC) machines was evaluated. While handling high priority jobs well, the shop was plagued by poor due date performance, especially with respect to routine jobs. Several straightforward recommendations emerged, some of which have subsequently been implemented with positive results.
SCIMA tietueen numero: 163562
lisää koriin
SCIMA