haku: @freeterm MATERIALFLUSS, OPTIMIERUNGSRECHNUNG / yhteensä: 3
viite: 3 / 3
« edellinen | seuraava »
Tekijä:Askin, R. G.
Chio, K. S.
Otsikko:A graph partitioning procedure for machine assignment and cell formation in group technology (Gruppentechnology; Maschinenbelegungsplanung)
Lehti:International Journal of Production Research
1990 : AUG, VOL. 44E - 28:8, p. 1555-1572
Asiasana:
Vapaa asiasana:MATERIALFLUSS, OPTIMIERUNGSRECHNUNG
Kieli:eng
Tiivistelmä:This paper proposes a mathematical model and solution procedure for the group technology configuration problem: the grouping of individual machines into cells and the routing of components to machines within cells. Costs of inventory, machine depreciation, machine setup and material handling are incorporated into a mathematical programming formulation. An approach for determining economic batch sizes in this environment is and examples are included. The flexibility of the approach to various environments is discussed.
SCIMA tietueen numero: 143929
lisää koriin
« edellinen | seuraava »
SCIMA