haku: @author Schniederjans, M. / yhteensä: 4
viite: 1 / 4
« edellinen | seuraava »
Tekijä:Olson, J.
Schniederjans, M.
Otsikko:A heuristic scheduling system for ceramic industrial coatings
Lehti:Interfaces
2000 : SEP-OCT, VOL. 30:5, p. 16-22
Asiasana:HEURISTIC METHODS
SCHEDULING
CERAMICS INDUSTRY
Kieli:eng
Tiivistelmä:The authors developed and implemented a heuristic-based scheduling system for Ceramic Industrial Coatings (CIC), a large producer of paint and wood coatings in the Midwest. The authors experienced implementation issues and problems in the process of developing the heuristic system. The paint coating industry has unique scheduling problems. Results included a 39-percent reduction in manufacturing processing time, a 23-percent reduction in late batches, a 49-percent reduction in scrapped batches, and a 72-percent reduction in scrap cost.