haku: @author Hendry, L. C. / yhteensä: 4
viite: 2 / 4
Tekijä: | Kingsman, B. G. Tatsiopoulos, I. P. Hendry, L. C. |
Otsikko: | A structural methodology for managing manufacturing lead times in make-to-order companies. |
Lehti: | European Journal of Operational Research
1989 : MAY 25, VOL. 40:2, p. 196-209 |
Asiasana: | PRODUCTION CONTROL PRODUCTION PLANNING CONTROL SYSTEMS JOB-SHOP SCHEDULING |
Kieli: | eng |
Tiivistelmä: | A methodology to control manufacturing lead times is developed. Past approaches concentrate on scheduling orders through the shop floor to meet their specified delivery dates. This is clearly sub-optimal since it covers only a part of the total lead time. A higher level approach in which the order book is deliberately moulded into a shape that can be produced profitably, is more appropriate. This should be achieved at the consumer enquiry stage, when prices and delivery dates to be quoted are determined. Hence a structural approach is adopted which includes customer orders planning and job release functions. |
SCIMA