Tekijä:Dar-El, E. M.
Rabinovitch, M.
Otsikko:Optimal planning and scheduling of assembly lines (Montage)
Lehti:International Journal of Production Research
1988 : VOL. 26:9, p. 1433-1490
Asiasana:
Vapaa asiasana:FERTIGUNGSPROGRAMMPLANUNG,
REIHENFOLGEPROBLEM
Kieli:eng
Tiivistelmä:This paper explores the economic conditions under which single-model assembly lines are operated in a batch mode rather than by the traditional method of continuous production at the demand rate. A model for optimizing the 'cycle time, station number' combination is developed through consideration of five factors: the learning, inventory, setup, balancing and facility costs.