haku: @indexterm ALGORITHMS / yhteensä: 403
viite: 154 / 403
Tekijä: | Guinet, A. |
Otsikko: | Textile production systems: a succession of non-identical parallel processor shops |
Lehti: | Journal of the Operational Research Society
1991 : AUG, VOL. 42:8, p. 655-71 |
Asiasana: | TEXTILE INDUSTRY PRODUCTION SEQUENTIAL ANALYSIS PRODUCTION SCHEDULING ALGORITHMS GRAPHS |
Kieli: | eng |
Tiivistelmä: | The paper concerns sequencing production operations in parallel processor shops of a textile company. The complexity of the problems of scheduling depends on the machine changeover times which occur when the changeovers cannot be realized in parallel during processing times, and the operation due dates which have to be at best respected when the workshops do not constitute stocks. The objective is to minimize mean completion time or mean tardiness. These different scheduling problems are modelled. Some tools to solve them are presented, the choice of algorithms issued from the graph theory and employed in industrial studies is explained. |
SCIMA