haku: @freeterm Fertigungsprogrammplanung / yhteensä: 47
viite: 28 / 47
Tekijä:Enns, S. T.
Otsikko:Finite scheduling: performance comparisons when due dates are internally set (Maschinenbelegungsplanung)
Lehti:Production and Inventory Management Journal
1995 : SEP, VOL. 36:3, p. 5-10
Asiasana:
Vapaa asiasana:FERTIGUNGSPROGRAMMPLANUNG
Kieli:eng
Tiivistelmä:In this study, the performance of two common schedule construction approaches, blocked time and event driven, are examined. A simulation model facilitates testing these two approaches, using various due date dependent loading rules and shop utilization levels. Issues related to planned lead times, delivery performance, and schedule stability are examined.
SCIMA tietueen numero: 145327
lisää koriin
SCIMA