Tekijä:Guide, V. D. R. Jr
Otsikko:Scheduling using drum/buffer/rope in a remanufacturing environment (Maschinenbelegungsplanung, Montage, mathematisches Modell)
Lehti:International Journal of Production Research
1996 : APR, VOL. 34:4, p. 1081-1091
Asiasana:
Vapaa asiasana:FERTIGUNGSPROGRAMMPLANUNG
Kieli:eng
Tiivistelmä:Scheduling in a remanufacturing environment is more complex and the schedular must deal with more uncertainty than in a traditional manufacturing environment. The schedule must be able to cope with conditional routeing, a routeing that may or may not be taken due to the condition of the unit. Drum/buffer/rope (DBR) offers an extremely robust method of scheduling. A realistic example is discussed in detail and each step to build a schedule using DBR is explained. The results from a simulation model at a repair/rework depot are benchmarked against the present production planning and control system.
SCIMA tietueen numero: 151360