Tekijä:Frazier, G.V.
Otsikko:An evaluation of group scheduling heuristics in a flowline manufacturing cell (Maschinenbelegungsplanung, Heuristische Methode)
Lehti:International Journal of Production Research
1996 : APR, VOL. 34:4, p. 959-976
Asiasana:
Vapaa asiasana:FERTIGUNGSPROGRAMMPLANUNG
Kieli:eng
Tiivistelmä:When a company adopts cellular manufacturing and creates a cell, one operational problem that must be addressed is how to schedule parts within the cell. Many studies investigated scheduling rules in a cellular manufacturing environment. However, there has been little consensus on the best scheduling rule. To address this lack of consensus, this study evaluated the best scheduling rules. The scheduling rule that performed best was selecting the part family with the most waiting jobs and sequencing these jobs in shortest processing time order, a relatively simple rule.
SCIMA tietueen numero: 154047