haku: @freeterm Fertigungsprogrammplanung / yhteensä: 47
viite: 11 / 47
Tekijä: | Aigbedo, H. Monden, Y. |
Otsikko: | A simulation analysis for two-level sequence scheduling for just-in-time (JIT) mixed model assembly lines (Mathematisches Modell) |
Lehti: | International Journal of Production Research
1996 : NOV, VOL. 34:11, p. 3107-3124 |
Asiasana: | |
Vapaa asiasana: | FERTIGUNGSSTEUERUNG, FERTIGUNGSPROGRAMMPLANUNG |
Kieli: | eng |
Tiivistelmä: | The JIT concept, which was developed by Toyota Motor Corporation in Japan, primarily aims at reducing work in process inventory by a 'pull' phenomenon. This paper experimentally investigates for problems of practical sizes, the effect on sub-assembly usage smoothing when the product usage smoothing goal is considered together with the sub-assembly usage smoothing goal in the determination of the assembly line product sequence. The experimental procedure, evaluation procedure, and factorial analysis are explained and the results are discussed. |
SCIMA