haku: @author Chandrashekar, A. / yhteensä: 5
viite: 5 / 5
« edellinen | seuraava »
Tekijä:Chandrashekar, A.
Otsikko:Just-in-time: a case study of the grind behind the glamour (Zuliefererbetriebe, Kontrollsystem, Planungsmodell)
Lehti:International Journal of Purchasing and Materials Management
1994 : FALL, VOL. 30:4, p. 20-26
Asiasana:
Vapaa asiasana:EINKAUFSPOLITIK, LIEFERANT, JAPAN,
ZWISCHENBETRIEBLICHE ZUSAMMENARBEIT
Kieli:eng
Tiivistelmä:Just-in-time (JIT) manufacturing methods can be implemented successfully only when the program is supported by intensive planning and control systems. This article presents a case study describing the type and nature of planning used by Fuji Electric, a large Japanese manufacturer. The presentation also discusses some little known facts about the methods used by the Japanese to rate and control suppliers.
SCIMA tietueen numero: 132067
lisää koriin
« edellinen | seuraava »
SCIMA