haku: @indexterm MATERIALS REQUIREMENTS PLANNING / yhteensä: 5
viite: 5 / 5
« edellinen | seuraava »
Tekijä: | Drexl, A. Haase, K. Kimms, A. |
Otsikko: | Losgrössen- und Ablaufplanung in PPS-Systeme |
Lehti: | Zeitschrift für Betriebswirtschaft
1995 : VOL. 66:3, p. 267-285 |
Asiasana: | MATERIALS REQUIREMENTS PLANNING PRODUCTION PLANNING LOT-SIZE MODEL |
Kieli: | ger |
Tiivistelmä: | Lotsizing and scheduling comprises activites which have to be done repeatedly within MRP-systems. First, we show via a simple example the deficiencies arising within the MRP- context by neglecting the interrelationships of multi-stage systems. Second, we propose a new model for multi-item, multi-stage, capacitated , dynamic lotsizing and scheduling. Third, a simple stochastic backward algorithm with biased sampling via randomized regrets is presented. This method is simple and effective. |
« edellinen | seuraava »
SCIMA