Tekijä: | Yingling, J. |
Otsikko: | Analysis of the twisting department at Superior Cable Corporation: a case study |
Lehti: | European Journal of Operational Research
1999 : MAY 16, VOL. 115:1, p. 19-35 |
Asiasana: | OPERATIONAL RESEARCH SIMULATION WORK MEASUREMENT |
Kieli: | eng |
Tiivistelmä: | The production of communication cables involves four major serial operations, namely tandem, twisting, stranding, and jacketing. Superior Cable Corporation manufactures such communications cables at the Elizabethtown, Kentucky plant. The bottleneck operation in this facility is the twisting department. In this paper, the authors used simulation to analyze the operations in the twisting department and provide several recommendations to improve the production capacity of this department. |