haku: @author Boctor, F. F. / yhteensä: 6
viite: 2 / 6
Tekijä: | Boctor, F. F. |
Otsikko: | Resource constrained project scheduling by simulated annealing |
Lehti: | International Journal of Production Research
1996 : AUG, VOL. 34:8, p. 2335-2351 |
Asiasana: | |
Vapaa asiasana: | PROJEKTMANAGEMENT, REIHENFOLGEPROBLEM |
Kieli: | eng |
Tiivistelmä: | This paper presents a new adaption of the simulated annealing algorithm for solving non-preemptive resource constrained project scheduling problems in which resources are limited but renewable from period to period. This algorithm is able to handle single mode and multimode problems and to optimize different objective functions. Statistical experiments show the efficiency of the proposed algorithm even in comparison to some tabu search heuristics. |
SCIMA