haku: @indexterm Scheduling / yhteensä: 635
viite: 257 / 635
Tekijä:Suresh, N.
Meredith, J.
Otsikko:Coping with the loss of pooling synergy in cellular manufacturing systems
Lehti:Management Science
1994 : APR, VOL. 40:4, p. 466-483
Asiasana:SCHEDULING
GROUP TECHNOLOGY
SIMULATION
Kieli:eng
Tiivistelmä:The conversion of a functional layout into a cellular manufacturing system involves the partitioning of several multiserver work centers. The loss of pooling synergy in this process can be significant, and this paper investigates the impact of several measures to overcome the adverse effects on flow time, work-in-process inventory and machine utilization. These can be alleviated to a certain extent through reductions in setup times and lot sizes that has been traditionally emphasized in group technology, but a more concerned effort is required.
SCIMA tietueen numero: 114335
lisää koriin
SCIMA