haku: @author Adenso-Díaz, B. / yhteensä: 7
viite: 7 / 7
« edellinen | seuraava »
| Tekijä: | Adenso-Diaz, B. |
| Otsikko: | Restricted neighborhood in the tabu search for the flowshop problem |
| Lehti: | European Journal of Operational Research
1992 : OCT 9, VOL. 62:1 p.27-36 |
| Asiasana: | HEURISTIC METHODS FLOW PRODUCTION SCHEDULING MANUFACTURING INDUSTRY |
| Kieli: | eng |
| Tiivistelmä: | The author examines the minimizing weighted tardiness of jobs in a scheduling problem where the structure is that of the proportionate flowshop. The writer presents a new version of the Widmer-Hertz algoritm for the makespan problem. The heuristic tests were applied to 720 flowshop problems, from 10 to 50 jobs. |
« edellinen | seuraava »
SCIMA