haku: @freeterm FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM / yhteensä: 7
viite: 2 / 7
Tekijä:Aanen, E.
Gaalman, G. J.
Nawijn, W. M.
Otsikko:A scheduling approach for a flexible manufacturing system (Mathematisches Modell, Maschinenbelegungsplanung)
Lehti:International Journal of Production Research
1993 : OCT, VOL. 31:10, p. 2369-2385
Asiasana:
Vapaa asiasana:FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM
Kieli:eng
Tiivistelmä:This paper discusses the scheduling problem of a particular flexible manufacturing system (FMS). The two main components of the FMS are a CNC turret lathe and a CNC machining centre. In the system a wide range of different jobs has to be processed. Each job consists of one or more processing operations on one or both machines. In this paper a branch and bound algorithm is described based on an active schedule strategy. Solutions are compared to results obtained by a simple dispatching rule.
SCIMA tietueen numero: 125625
lisää koriin
SCIMA