haku: @freeterm FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM / yhteensä: 7
viite: 2 / 7
Tekijä: | Aanen, E. Gaalman, G. J. Nawijn, W. M. |
Otsikko: | A scheduling approach for a flexible manufacturing system (Mathematisches Modell, Maschinenbelegungsplanung) |
Lehti: | International Journal of Production Research
1993 : OCT, VOL. 31:10, p. 2369-2385 |
Asiasana: | |
Vapaa asiasana: | FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM |
Kieli: | eng |
Tiivistelmä: | This paper discusses the scheduling problem of a particular flexible manufacturing system (FMS). The two main components of the FMS are a CNC turret lathe and a CNC machining centre. In the system a wide range of different jobs has to be processed. Each job consists of one or more processing operations on one or both machines. In this paper a branch and bound algorithm is described based on an active schedule strategy. Solutions are compared to results obtained by a simple dispatching rule. |
SCIMA