haku: @author Fry, T. D. / yhteensä: 7
viite: 1 / 7
« edellinen | seuraava »
Tekijä:Russell, G. R.
Fry, T. D.
Otsikko:Order review/release and lot splitting in drum/buffer/rope (Fertigungskontrolle; Kapazitätsplanung)
Lehti:International Journal of Production Research
1997 : MAR, VOL. 35:3, p. 827-845
Asiasana:
Vapaa asiasana:FERTIGUNGSSTEUERUNG, FERTIGUNGSPLANUNG,
LOSGRÖSSE
Kieli:eng
Tiivistelmä:A recently developed alternative to traditional planning and control systems such as MRP and JIT is the drum/buffer/rope (DBR) system. The most obvious application of the DBR is when plant performance is constrained by a lack of manufacturing capacity at a key workcenter. This study investigates two issues relating to the operation of the DBR. Specifically, what order review release (ORR) methodologies are best suited for a DBR and what is the impact of splitting process batches into several transfer batches? First, a brief introduction to the DBR system is presented for those readers unfamiliar with the system.
SCIMA tietueen numero: 163669
lisää koriin
« edellinen | seuraava »
SCIMA