haku: @indexterm inventory control / yhteensä: 880
viite: 231 / 880
Tekijä:El-Najdawi, M.
Kleindorfer, P.
Otsikko:Common cycle lot-size scheduling for multi-product, multi-stage production
Lehti:Management Science
1993 : JUL, VOL. 39:7, p. 872-885
Asiasana:INVENTORY CONTROL
PRODUCTION PLANNING
PRODUCTION SCHEDULING
JOB-SHOP SCHEDULING
Kieli:eng
Tiivistelmä:In this paper the authors study the Common Cycle Scheduling Problem (CCSP). This classic production problem is concerned with determining optimal production lot sizes for a given set of products using a common facility. CCSP is based on scheduling all products using a common (base) cycle time, so that the lot size for each product is the forecasted demand for that product over the base cycle time. This research provides an optimizing framework for CCSP for a multi-stage, multi-product, flow-shop environment under deterministic and stationary conditions, assuming a fixed sequence is maintained across all processing stages.
SCIMA tietueen numero: 108567
lisää koriin
SCIMA