haku: @author Tang, C. / yhteensä: 9
viite: 9 / 9
« edellinen | seuraava »
Tekijä: | So, K. Tang, C. |
Otsikko: | Optimal batch sizing and repair strategies for operations with repairable jobs |
Lehti: | Management Science
1995 : MAY, VOL. 41:5, p. 894-908 |
Asiasana: | MANAGEMENT SCIENCE STRATEGY OPERATIONAL RESEARCH |
Kieli: | eng |
Tiivistelmä: | This paper presents a model of a bottleneck facility that performs two distinct types of operations: "regular" and "repair". Both switch-over time and cost are incurred when the facility switches from performing one type of operation to a different type. Upon the completion of a batch of jobs in the regular mode, each batch is subjected to a test, where the entire batch will be classified accordingly as either nondefective, repairable , or nonrepairable. |
« edellinen | seuraava »
SCIMA