haku: @indexterm FLOW PRODUCTION / yhteensä: 48
viite: 1 / 48
« edellinen | seuraava »
Tekijä:Wilson, A.D.
King, R.E.
Wilson, J.R.
Otsikko:Case study on statistically estimating minimum makespan for flow line sheduling problems
Lehti:European Journal of Operational Research
2004 : JUN, VOL. 155:2, p. 439-454
Asiasana:Scheduling
Estimation
Flow production
Case studies
Kieli:eng
Tiivistelmä:In this paper, extreme value theory is used to construct confidence-interval estimates of the minimun makespan achievable when scheduling nonsimilar groups of jobs on a two-stage flow line. Experimental results based on randomly sampled solutions to each of 180 randomly generated test problems revealed that (i) least-squares parameter estimators outperformed standard analytical estimators for the Weibull approximation to the distribution of the sample minimum makespan; (ii) to evaluate each Weibull fit reliably, both the Anderson-Darling and Kolmogorov-Smirnov goodness-of-fit tests should be used; and (iii) applying a local improvement procedure to a large sample of randomly generated initial solutions improved the probability that the resulting Weibull fit yielded a confidence interval covering the minimum makespan.
SCIMA tietueen numero: 255114
lisää koriin
« edellinen | seuraava »
SCIMA