haku: @indexterm structural analysis / yhteensä: 146
viite: 7 / 146
Tekijä:Del Boca A. (et al.)
Himmelberg C. P.
Galeotti M.
Otsikko:Investment and time to plan and build: A comparison of structures vs. equipment in a panel of Italian firms
Lehti:Journal of the European Economic Association
2008 : JUN, VOL 6:4, p. 864-889
Asiasana:models
investment analysis
structural analysis
empirical research
Vapaa asiasana:models of investment
business cycle
time-to-build effect
Kieli:eng
Tiivistelmä:Time to build models of investment expenditures play an major role in many traditional and modern theories of the business cycle, especially for explaining the dynamic propagation of shocks. We estimate the structural parameters of a time-to-build model using firm-level investment data on equipment and structures. For equipment expenditures, we discover no evidence of time-to-build effects beyond one period. For structures, by contrast, there is clear evidence of time to build in the range of 2-3 years. The contrast between equipment and structures is intuitively reasonable and consistent with previous results. The estimates for structures also indicate that initial-period expenditures are low, and increase as projects near completion. These results provide empirical support for including time to plan effects for investment in structures. More generally, these results suggest a potential source of specification error for Q models of investment and production-based asset pricing models that ignore the time required to plan, build and install new capital.
SCIMA tietueen numero: 274380
lisää koriin
SCIMA