search query: @keyword varastonhallinta / total: 15
reference: 8 / 15
Author: | Kokkonen, Juha-Matti |
Title: | Komponenttitehtaan osien ohjausmallin suunnittelu |
Designing a control system for parts of a component factory | |
Publication type: | Master's thesis |
Publication year: | 2012 |
Pages: | 110 + [9] Language: fin |
Department/School: | Koneenrakennustekniikan laitos |
Main subject: | Tuotantotekniikka (Kon-15) |
Supervisor: | Niemi, Esko |
Instructor: | Tiainen, Antero |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark Aalto | Archive |
Keywords: | production planning inventory control MRP valve manufacturing tuotannonohjaus varastonhallinta MRP venttiilivalmistus |
Abstract (eng): | The aim of this thesis is to create a control system for standard valve parts required in Metso Automation's new valve factory. In the factory most manufactured valves, which are mainly standard valves with a fixed price and delivery time, are assembled in the so-called Green assembly line. In order to achieve the on-time delivery target, the availability of the parts required in the Green assembly line must be improved and maintained at a certain level. The thesis consists of a literature review, an as-is analysis and a case chapter in which the new control system is designed. The design of the control system is based on the development areas identified in the as-is analysis by interviews, data-analyses and other observations. The main targets of the system are improving inventory control and management, increasing visibility of production and warehousing, and levelling the flow of inbound logistics. Suggestions and best practices found in the literature review are used in the design phase of the thesis. In addition to material resource planning (MRP) and two-bin control methods already used in the company, three new control policies are introduced in the thesis. The new methods are reorder-point control, forecast ordering and visual Kanban-based pull-control. The most critical factors affecting control of the parts are defined and used for segmentation of parts and for selection of the best control policy for each of these part groups. Moreover, processes and measurements for implementing and maintaining the new system are defined to ensure functionality of the new control system, In future, segmentation and part-level analyses can also be utilized for inbound logistics and warehouse planning and for visualizing the production flow at the shop-floor level. |
Abstract (fin): | Diplomityön tavoitteena on suunnitella ohjausmalli Metso Automation Oy:n keväällä 2011 avatun venttiilitehtaan vakioventtiilien osille. Uudessa tehtaassa on eriytetty oma tuotantolinja eli vihreä kokoonpanolinja volyymituotteille, jotka koostuvat pääsiallisesti ennalta sovittuun hintaan ja toimitusaikaan asiakkaille toimitettavista vakioventtiileistä. Työssä suunniteltavan ohjausmallin tarkoituksena on parantaa vihreän kokoonpanolinjan tarvitsemien vakioventtiilien osien saatavuutta asetettuihin toimitusvarmuustavoitteisiin pääsemiseksi. Diplomityö koostuu kirjallisuustutkimuksesta, nykytila-analyysista sekä ohjausmallin toiminnan ja käyttöönoton suunnittelusta. Työssä suunniteltavalla ohjausmallilla pyritään vastaamaan nykytila-analyysissa haastatteluiden ja data-analyysien avulla löydettyihin kehityskohteisiin eli varastonhallinnan menetelmien kehittämiseen, visuaalisuuden lisäämiseen sekä saapuvan materiaalivirran tasoittamiseen. Ohjausmallin suunnittelussa pyritään hyödyntämään kirjallisuustutkimuksessa esiin tulevia suosituksia ja toimintatapoja. Työssä suunniteltavassa ohjausmallissa venttiiliosille määritellään kolme uutta ohjaustapaa aiemmin käytössä olleiden tarvelaskenta- ja kaksilaatikko-perusteisten menetelmien rinnalle. Uudet ohjaustavat perustuvat tilauspiste- ja ennusteohjaukseen sekä visuaaliseen Kanban -ohjaukseen. Työssä määritellään osien ohjauksen kannalta merkittävimmät tekijät, joiden perusteella venttiiliosat segmentoidaan eri ohjaustapojen mukaisiin ryhmiin. Työssä suunnitellaan lisäksi prosessit ja mittaristot osien ohjaamisen ylläpitämiseen sekä toiminnan mittaamiseen jatkossa. Tulevaisuudessa työssä tehtyä osien segmentointia on mahdollista hyödyntää myös tehtaan sisäistä logistiikkaa, töiden visuaalista ohjausta sekä varastojen fyysistä sijaintia suunniteltaessa. |
ED: | 2012-05-09 |
INSSI record number: 44450
+ add basket
INSSI