search query: @keyword design-build-operate / total: 1
reference: 1 / 1
« previous | next »
Author:Neva, Pekka Erik
Title:Elinkaarimallilla toteutettujen tilahankkeiden kokonaistaloudellisuuden arviointi
Value-for-money assessment of building sector public private partnerships
Publication type:Master's thesis
Publication year:2013
Pages:vii + 69 + [12]      Language:   fin
Department/School:Maankäyttötieteiden laitos
Main subject:Kiinteistöoppi   (Maa-20)
Supervisor:Junnila, Seppo
Instructor:Rajakallio, Karoliina ; Slätis, Carl
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  521   | Archive
Keywords:public-private partnerships
value-for-money assessment
design-build-operate
elinkaarimalli
kokonaistaloudellisuuden arviointi
suunnittele-rakenna-ylläpidä
Abstract (eng): This research study examines Finnish public-private partnerships in the building sector.
The main objective of the study was to make a value-for-money assessment of a single design-build-operate PPP project in the school sector.
Additionally the aim of the research was to explore the concept of PPP and also usable frameworks in assessing value-for-money in PPP projects.

The research strategy of this study was to explore a single PPP project by the means of case study.
The case selected for the assessment was a school PPP project, encompassing renovation and extension works as well as the design and operation functions in three schools.
A Finnish framework for value-for-money assessment, comprising of a PPP and public sector comparator comparison was used in the case study.
The value-for-money assessment framework took into account the lifecycle costs and the differences in the income-generating abilities of the procurement models.
Also, a risk adjustment was made for the public sector comparator.
The value-for-money assessment also included a comparison of quality, consisting of a small survey study and qualitative research.

The findings of the value-for-money assessment indicate that the procurement methods under examination did not significantly differ from each other in terms of value-for-money to the public sector.
The results of the final net present cost comparison were in favour of the PPP alternative, but only by approximately one percentage.
The comparison of the quality of the two procurement systems implied a better realized level of quality in the PPP alternative, from the viewpoint of the owner (the municipality) and the occupants (in this case the school staff).

The value-for-money assessment framework used in the case study was found to be somewhat problematic in evaluating the performance of PPPs in terms of validity of the assessment.
This finding correlates with the findings of previous studies concerning the assessment of PPPs.
Abstract (fin): Työ käsittelee elinkaarimallilla toteutettuja tilahankkeita Suomessa.
Tutkimuksen pääsiallisena tavoitteena oli tutkia yksittäisen elinkaarimallilla toteutetun kokonaistaloudellisuutta tilaajan kannalta.
Tämän lisäksi tutkimuksessa selvitettiin, mitä tarkoitetaan elinkaarimalli-käsitteellä, sekä millä tavalla elinkaarimallilla toteutettujen tilahankkeiden kokonaistaloudellisuutta on arvioitu.

Työn tutkimusstrategiana oli tapaustutkimus, jossa selvitettiin yksittäisen elinkaarimallilla toteutetun tilahankkeen, Espoon kaupungissa toteutetun Elinkaari I hankkeen, kokonaistaloudellisuutta tilaajan, eli Espoon kaupungin Tilakeskus-liikelaitoksen kannalta.
Tapaustutkimuksessa sovellettiin elinkaarimallin ja julkisen sektorin perinteistä tuotantoa edustavan verrokin vertailuun perustuvaa arviointimallia.
Arvioinnissa otettiin huomioon tutkittavan kohteen elinkaarikustannukset ja tuottokyvyt kummankin hankintamallin osalta, jonka lisäksi arvioitiin elinkaarimalliin liittyvän laajemman riskien jaon taloudellista merkitystä tilaajalle.
Lisäksi hankintamallien tuottamaa laatua arvioitiin asiakastyytyväisyyskyselyin sekä kvalitatiivisella tarkastelulla.

Tapaustutkimuksessa havaittiin, että elinkaarimallin ja parasta julkisen sektorin perinteistä tuotantoa edustavan verrokin kokonaistaloudellisuudessa ei ole suuria eroja.
Riskeillä ja hankintamallien tuottoeroilla kompensoitujen elinkaarikustannusten eroksi havaittiin noin prosentti, elinkaarimallin edustaessa edullisempaa vaihtoehtoa.
Hankkeiden kokonaistaloudellisuuden selvittämisessä kummankin toteutustavan kassavirtoja diskontattiin samalla korkokannalla.
Laatutarkastelu implikoi elinkaarimallin tuottavan parempaa kohteen käyttövaiheen laatua sekä omistajan, että tilaajan kannalta verrattuna julkisen sektorin perinteiseen toteutukseen.

Tutkimuksessa käytetty kokonaistaloudellisuuden arviointimalli, joka edustaa yleistä käytäntöä elinkaarihankkeiden arvioinnissa kansainvälisesti, havaittiin osin haasteelliseksi tavaksi arvioida elinkaarihankkeita sen tuottamien tulosten luotettavuuden ongelmien takia.
Havainto ei eroa kirjallisuudessa aiemmin esiintyneistä johtopäätöksistä.
ED:2013-12-02
INSSI record number: 47507
+ add basket
« previous | next »
INSSI