search query: @keyword tapahtumapohjainen simulointi / total: 11
reference: 4 / 11
Author: | Willgren, Sven |
Title: | Simulation study of a new heavy machinery assembly plant |
Uuden raskaita koneita valmistavan kokoonpanotehtaan simulaatiotutkimus | |
Publication type: | Master's thesis |
Publication year: | 2010 |
Pages: | 77 Language: eng |
Department/School: | Insinööritieteiden ja arkkitehtuurin tiedekunta |
Main subject: | Tuotantotekniikka (Kon-15) |
Supervisor: | Niemi, Esko |
Instructor: | Korhonen, Juha |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark Aalto | Archive |
Keywords: | simulation Simul8 Arena quantitative modeling Visual Logic production modeling discrete-event simulation Bézier-distribution heavy machinery cranes new factory factory design plant design simulointi Simul8 Arena kvantitatiivinen mallintaminen Visual Logic tuotannon mallintaminen tapahtumapohjainen simulointi Bézier-jakauma raskaat koneet nosturit uusi tehdas tehdassuunnittelu |
Abstract (eng): | The subject of this thesis is a discrete-event simulation study of a new assembly plant that produces heavy machinery. The objectives are to confirm static calculations of the correct number of assembly cells and to study the effects crane resources have on inter-departure time and lead time. Labour requirements are also discussed, although they are not a primary point of interest. The theoretical part of this thesis offers an introduction to basic tools and methods of discrete-event simulation. A more practical approach to the aforementioned follows in the form of an introduction to basic elements and properties of Simul8 simulation software. The application of these elements in modelling the factory is discussed in detail. Among the most important aspects of the modelling are the use of work centre elements as work phases instead of working units and the custom result collection system that necessarily follows from this modelling approach. Other points of interest are the modelling of processes that go on outside simulation time and robust handling of resources in a complex model. These modelling techniques that overcome or augment some of the limitations of standard Simul8 repertoire can be applied in other modelling projects, and have been described in adequate detail to replicate them. Visual Logic source code is listed in an appendix of this thesis. The modelling solutions are in some cases explained using parts of the actual model, and in some cases using more generalized examples. To protect confidential information, some results of simulation experiments are represented as scaled or normalized figures or as graphs devoid of numbers. The actual explicit results are enclosed in a non-public appendix of this thesis. Recommendations for the number of assembly cells and cranes are given as conclusions drawn from the results of the simulation experiments. Also, a recommendation for a new source of starting impulse for a subassembly is given. The actual results provide estimates for average lead times and inter-departure times, and for utilizations of selected key resources. |
Abstract (fin): | Diplomityössä käsitellään uuden raskaita koneita tuottavan kokoonpanotehtaan tutkimusta tapahtumapohjaisen simulaation avulla. Tutkimuksen keskeisimpinä tavoitteina on tuotantosolujen tarvittavan määrän varmistaminen sekä nosturikapasiteetin vaikutuksen selvittäminen tuotteiden läpimenoaikaan. Myös työvoiman tarpeeseen otetaan kantaa, vaikka se ei varsinaisesti ole tutkimustavoitteena. Teoriaosassa esitellään kappaletavaratuotannon tapahtumapohjaisen tietokonesimuloinnin keskeisimmät menetelmät ja työkalut. Soveltavassa osassa esitellään tarkemmin valitun simulointiohjelmiston keskeisimmät elementit ja ominaisuudet, ja siirrytään sen jälkeen niiden soveltamiseen kokoonpanoprosessin mallintamisessa. Käytetyt menetelmät ovat sovellettavissa myös muissa, vastaavissa simulointiprojekteissa ja itse laaditut menetelmät on pyritty kuvaamaan riittävällä tarkkuudella niiden toistamiseksi. Mallin sisältämä Visual Logic -lähdekoodi on diplomityön liitteenä listauksena. Tärkeimpiä ratkaistuja ongelmia ovat resurssien hallinta sekä työ- ja simulointiajan ulkopuolella jatkuvien prosessien mallinnus Simul8-ohjelmistolla. Huomionarvoista on myös yleensä työstökoneiden tai työpisteiden mallintamiseen käytettyjen simulointielementtien käyttö työvaiheiden ja ohjauslogiikan komponentteina sekä siihen liittyvä itse toteutettu kuormitustietojen kerääminen. Tuotantoprosessin mallintamista käsitellään osittain mallista otettujen esimerkkien, osittain yleistettyjen tapausten kautta. Luottamuksellisen tiedon suojaamiseksi tutkimustuloksia ja tuotantoprosessia käsitellään diplomityössä tehtyjen havaintojen kautta, ja tutkimustulokset esitetään pääsääntöisesti skaalattuna, normalisoituna tai kokonaan ilman numeroarvoja kuitenkin niin, että suureiden keskinäiset suhteet tulevat esitetyksi oikein. Tarkat tulokset on esitetty erillisessä liitteessä, jota ei ole sisällytetty diplomityön julkisiin kopioihin. Simulointitutkimuksen tuloksina esitetään suositukset kokoonpanosolujen määräksi ja nosturikapasiteetiksi sekä tuotantoprosessin keskimääräiset läpimenoajat, poistumisvälit sekä avainresurssien kuormitukset. Lisäksi alun perin ehdotettuun osakokoonpanon aloitusimpulssiin esitetään muutosta. |