Author:Mäki, Johanna
Title:Kaasukombivoimalaitoksen höyryprosessin tehonkorotusmahdollisuudet
Steam process power increase possibilities in combined cycle power plant
Publication type:Master's thesis
Publication year:2013
Pages:56 s. + liitt. 11      Language:   fin
Department/School:Energiatekniikan laitos
Main subject:Energiatalous ja voimalaitostekniikka   (Ene-59)
Supervisor:Ahtila, Pekka
Instructor:Hanioja, Jyrki
Electronic version URL: http://urn.fi/URN:NBN:fi:aalto-201609083482
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  5787   | Archive
Keywords:gas turbine
steam turbine
steam process
power increase
district heat
pressure reduction
kaasuturbiini
höyryturbiini
tehonkorotus
kaukolämpö
reduktioajo
Abstract (eng): This thesis is made for Helsingin Energia Vuosaari B power plant.
The purpose for this thesis is to study and model the combined cycle power plant and its steam process after power and efficiency increase of gas turbines.

It has been noted that steam process limits, when the steam flow is high while the power plant is at 100 % load.
Situations like these are examined with help of measurement data.
In addition, it is studied which equipment and operating values affect steam process limitation.

There are two options pointed out to solve the limitation problem and also to increase steam process power: re-dimensioning steam turbine high-pressure control valves or renewing district heat pressure reduction control valves.
The changes of heat and power production are calculated for these possibilities for the share of excess steam.
The costs of investments are estimated, and on the basis of all information viability calculations are made.

As a result of the calculations, it is primarily recommended to renew the district heat reduction valves.
Although both possibilities are profitable if prices of separate heat production and electricity is high.
Abstract (fin): Tämän diplomityön kohteena on Helsingin Energian Vuosaaren B-voimalaitos.
Työssä tutkitaan ja mallinnetaan kaasukombivoimalaitoksen ja sen höyryprosessin toimintaa kaasuturbiinien tehonkorotuksen ja hyötysuhteen noston jälkeen.

Höyryprosessin on havaittu rajoittavan suurilla höyryvirtauksilla laitoksen ollessa 100 % kuormalla.
Tämänkaltaiset rajoitustilanteet selvitetään laitoksen mittausdatan perusteella.
Lisäksi selvitetään laskennan avulla, mitkä laitteet ja toiminta-arvot vaikuttavat höyryprosessin läpäisyyn.

Selvityksen perusteella höyryprosessin läpäisyn ja tehon nostamiseksi esitetään kaksi vaihtoehtoa: höyryturbiinin korkeapainesäätöventtiileiden uudelleen mitoitus tai kaukolämpöreduktion säätöventtiileiden uusiminen.
Näille vaihtoehdoille lasketaan höyryprosessin lämpö- ja sähkötehon muutokset ylimäärähöyryn osalta.
Investoinneille arvioidaan kustannukset, ja tietojen pohjalta laaditaan molempien vaihtoehtojen kannattavuustarkastelu.

Diplomityön tuloksena suositellaan ensisijaisesti kaukosamporeduktion säätöventtiileiden uusimista, vaikka molempien vaihtoehtojen investoinnit kannattavat, jos erillistuotantolämmön ja sähkön hinta ovat korkealla.
ED:2013-10-16
INSSI record number: 47316