search query: @instructor Hyvärinen, Markku / total: 14
reference: 7 / 14
Author: | Pihkala, Atte |
Title: | Helsingin 110 ja 400 kV sähkönsiirtoverkon kehittäminen |
Development of 110 kV and 400 kV transmission networks in Helsinki | |
Publication type: | Master's thesis |
Publication year: | 2009 |
Pages: | 180 Language: fin |
Department/School: | Sähkötekniikan laitos |
Main subject: | Sähköverkot ja suurjännitetekniikka (S-18) |
Supervisor: | Lehtonen, Matti |
Instructor: | Hyvärinen, Markku |
Electronic version URL: | http://urn.fi/URN:NBN:fi:aalto-201203071353 |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark S80 | Archive |
Keywords: | load flow subtransmission network tehonjako alueverkko |
Abstract (eng): | The 110 kV subtransmission network in Helsinki includes cables and overhead lines. Because the local electricity production and consumption vary greatly depending on season, the magnitude and direction of power transfer also varies. Because of load growth, increasing need of transmission capacity and aging of network components, significant investments need to be made in the 110 kV network within the next 10 to 20 years. At the same time it is necessary to consider whether there should be big changes in the network architecture. The 110 kV subtransmission network includes double circuit overhead lines, which have high loading in some situations. To reduce transmission losses and the loading of 110 kV lines, expansion of the 400 kV network has been considered. If it is necessary to increase transmission capacity, cables need to be used, as it is not possible to build new overhead lines. When the load is high, 400 kV cables are less expensive that 110 kV cables. In this thesis different 110 kV and 400 kV networks solutions have been analyzed, so that the future challenges of the transmission network could be solved. |
Abstract (fin): | Helsingin silmukoitu 110 kV alueverkko koostuu kaapeleista ja avojohdoista. Paikallisen tuotannon ja kulutuksen ajallisesta vaihtelusta johtuen verkossa siirrettävien tehojen suuruus ja suunta vaihtelevat suuresti vuodenajan mukaan. Kulutuksen ja siirtotarpeen kasvun ja verkkokomponenttien vanhenemisen vuoksi 110 kV verkossa joudutaan tekemään seuraavien 10-20 vuoden aikana merkittäviä investointeja. Samalla on aiheellista pohtia, olisiko verkossa syytä tehdä suuria rakenteellisia muutoksia. 110 kV alueverkossa on ns. runkojohtoina kaksoisavojohtoja, joiden kuormitus on joissakin tilanteissa korkea. Siirtohäviöiden pienentämiseksi ja 110 kV johtojen kuormituksen keventämiseksi on suunniteltu 400 kV verkon laajentamista Helsinkiin. Jos siirtokapasiteettia on tarve lisätä, se on toteutettava kaapeliyhteyksinä, koska uusien avojohtojen rakentaminen ei ole mahdollista. Suuritehoiset kaapeliyhteydet on edullisempi toteuttaa 400 kV jännitetasolla. Tässä työssä on analysoitu erilaisia 110 kV ja 400 kV verkkoratkaisuja, joilla Helsingin alueen sähkönsiirtoverkon tulevaisuuden haasteista voitaisiin selviytyä. |
ED: | 2009-11-16 |
INSSI record number: 38585
+ add basket
INSSI