search query: @keyword hankinnat / total: 14
reference: 2 / 14
« previous | next »
Author:Valtonen, Perttu
Title:Tietomallipohjainen projektisuunnitelma
BIM based project plan
Publication type:Master's thesis
Publication year:2011
Pages:93      Language:   fin
Department/School:Rakennustekniikan laitos
Main subject:Rakentamistalous   (Rak-63)
Supervisor:Junnonen, Juha-Matti
Instructor:Keinänen, Jyrki ; Halttula, Heikki
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:BIM infrastructure
project management
project plan
communications management
quality management
procurement management
BIM tietomalli
infra hanke
projektinhallinta
projektisuunnitelma
toteutusmuodot
tiedonkulku
hankinnat
laadunhallinta
Abstract (eng): According to previous studies, there have been major issues with the productivity in infrastructure building sector.
Lack of collaboration methods and communication tools within project team are recognized to be one reason for this.
One of most problematic tool is project plan, as it is an essential tool for project communication, but written document it hardly keeps up-to-date.

The solution for this could be BIM based project plan.
BIM based processes have been introduced for planning and visualizing purposes but there have not been any BIM based solutions for project management.
The purpose of this study is to find the areas of project management that could have the most use for BIM.
PMBok was chosen to be the framework for project management because of its wide acceptance.

BIM is useful for handling large amounts of data.
When all the information is linked in the model to a specific part of the project, the retrieving and sharing of it is much easier than with traditional paper documents.
This is important for project management, because successful production control requires all the time adequate up-to-date information.

The most interesting areas of project management for BIM at first place to apply were project communications management, quality management and procurement management.
Problems detected with communications, increasing amount and need of information due bigger projects and the potential of linking and sharing of information with BIM is why communication management should be among the first ones BIM apply to.
BIM based quality control allows comparing planning and as-built data, and stating exact quality with the differences.
BIM based procurement management can help communicating what stake holder wants.
Project manager can make more exact call for offers and due better understanding get better offers.
Abstract (fin): Projektisuunnitelma on keskeinen työkalu niin rakennuttajalle kuin palveluntuottajalle infrahankkeen projektinhallinnassa.
Sitä pidetään projektinhallinnan ammattilaisten mielestä tärkeänä tiedonvälityksen dokumenttina, johon osapuolten väliset yhdessä sovitut asiat kirjataan.
Infrahankkeiden projektinhallinnassa on kuitenkin tunnistettu aiemmissa tutkimuksissa ja julkaisuissa puutteita etenkin dokumenttipohjaisen tiedonhallinnan osalta.
Erityisesti tiedon päivitettävyys on koettu paperisten suunnitelmien heikkoudeksi.
Nämä ongelmat projektinhallinnassa heijastuvat osaltaan rakennusalaa yleisesti vaivaavana huonona tuottavuutena ja kustannusylityksinä.

Ratkaisuksi on ehdotettu mallipohjaista toimintatapaa.
Tästä on jo hyviä kokemuksia esimerkiksi infrahankkeen mallipohjaisesta massataloussuunnittelusta, jonka avulla on pystytty tarkastelemaan esimerkiksi tasauslinjan vaikutusta vaadittaviin massansiirtoihin.
Mallipohjaisista suunnitelmista laadittuja visuaalimalleja käytetään myös yleisesti havainnollistamisen apuvälineenä.
Mallipohjaisen työskentelyn etuja ei ole juurikaan tutkittu toteutusvaiheen projektinhallinnan kannalta.
Tämän tutkimuksen tarkoituksena on selvittää, mitkä projektinhallinnan osa-alueet hyötyvät eniten mallipohjaisesta toimintatavasta, mitä mallipohjaisia projektinhallinnan sovelluksia muilla teollisuudenaloilla on jo nyt käytössä ja mitä käyttöönoton edellytyksiä mallipohjaisen infrahankkeiden projektinhallintaan vaaditaan.
Projektinosittelun lähtökohdaksi valittiin PMBok sen yleisen tunnettavuuden vuoksi.

Mallipohjaisen tiedon ja projektinsuunnittelun keskeisin etu on suurien tietomäärien helppo käsitteleminen.
Kun tieto on sidottu toteutusta kuvaavaan malliin, on sen palauttaminen ja riippuvuuksien luominen eri tietosisältöjen väliin yksinkertaista.
Tämä on tärkeää projektinsuunnittelussa, sillä tuotannon ohjaaminen vaatii välitöntä reagointia muutoksiin ja poikkeamiin.
Tietomallipohjainen projektinsuunnittelu onkin siis parhaimmillaan, kun käytettävissä on kaikki hakkeeseen vaikuttava tieto.
Ensivaiheessa mielenkiintoisimmiksi ja toteuttamiskelpoisimmiksi tietomallipohjaisen projektisuunnittelun sovelluksiksi tunnistettiin tiedonkulunhallinta, laadunhallinta ja hankintojen hallinta.
Nykyiseen tiedonkulkuun liittyvät ongelmat ja uuden toimintatavan mahdollisuudet tekevät siitä ehdottomasti mielenkiintoisimman sovellusalan.
Mallipohjaisen tiedon visuaalisuutta, muokattavuutta ja hallittavuutta ei perinteisillä dokumenteilla voida saavuttaa.
Mallipohjainen laadunhallinta puolestaan mahdollistaa laadunvarmistuksen, kun toteutumatietoa verrataan rakennusosakohtaiseen laatumääritykseen.
Hankintojen hallinnan kannalta mielenkiintoista on, että mallipohjainen projektinosittelu mahdollistaa selkeämpien tarjouspyyntöjen tekemisen ja edesauttaa parempien tarjouksien saamista.
ED:2011-09-20
INSSI record number: 42770
+ add basket
« previous | next »
INSSI