search query: @instructor Oksanen, Nicholas / total: 2
reference: 1 / 2
« previous | next »
Author:Sihvola, Aino
Title:Modular mill cost model
Moduulipohjainen tehdaskustannusmalli
Publication type:Master's thesis
Publication year:2004
Pages:59      Language:   eng
Department/School:Kemian tekniikan osasto
Main subject:Tehdassuunnittelu   (Kem-107)
Supervisor:Hurme, Markku
Instructor:Oksanen, Nicholas ; Halmepuro, Jorma
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark TKK  3155   | Archive
Abstract (eng): This master's thesis examines the investment cost estimation procedure and its modular application.
The scope is limited to a newsprint mill and a demo-model is presented for one module, the broke thickening.

The theoretical part of the thesis focuses on the investment project and the role of the investment cost estimate during the project.
The project life-cycle is presented.
The thesis also examines existing tools for investment cost estimation at Jaakko Pöyry and their advantages and weaknesses.
As a basis for the experimental part, different kinds of breakdown structures are introduced.

The experimental part starts with the division of the mill.
The division extends through four hierarchical levels to a level where each module is representing a distinct function in the mill.
The modules are divided into process, operational, service and immaterial modules.

The structure and functions of the model are then presented in theory.
The model consists of three basic elements that are data input, data processing and data output.
The information that the model needs is the selection of modules and the design criteria of the process.
With this information, the process is dimensioned and real machinery is selected from the machinery database.
The model generates Jots of information of the process that can be gathered.
The machinery information can be listed as specifications of the process.
The cost information for the specifications is obtained from the cost database.
A cost estimate can be formed as a summary of the specifications.
The demo model is created by using Microsoft Excel.
It allows either default or user defined values to be used as design criteria.

The cost database is the most critical part of the model.
It has to be constantly updated to ensure the reliability of the model.
There is a lot of cost information but it is not easily available at present.
To get the most out of the model, the same model should be in use during the whole project development phase.
Abstract (fin): Diplomityössä tarkastellaan investoinnin kustannusarviointia ja sen moduulipohjaista sovellusta.
Työ on rajattu käsittämään paperitehdas ja demonstraatiomalli on tehty yhdestä moduulista, joka on hylyn sakeutus.

Työn teoriaosassa keskitytään investointiprojektiin ja investointikustannusarvion rooliin sen aikana.
Projektin elinkaari käydään läpi.
Työssä tarkastellaan myös Jaakko Pöyryllä käytössä olevia investointikustannuslaskennan työkaluja sekä niiden vahvuuksia ja heikkouksia.
Kokeellisen osan perustaksi esitellään erilaisia projektin erittelyrakenteita.

Työn soveltava osa alkaa tehtaan jaottelulla.
Jako on tehty käyttäen neljää hierarkkista tasoa.
Alimmalla tasolla jokaisella moduulilla on oma erillinen tehtävänsä tehtaassa.
Moduulit on jaoteltu neljään ryhmään, jotka ovat prosessi-, käyttö- ja palvelumoduulit sekä aineettomat moduulit.

Mallin rakenne ja toimintojen periaatteet on esitetty seuraavaksi.
Malli koostuu kolmesta perusosasta, jotka ovat tietojen syöttö, käsittely ja tulostus.
Mallin tarvitsemat tiedot ovat haluttu moduulivalikoima sekä prosessin suunnittelukriteerit.
Näiden tietojen pohjalta prosessi mitoitetaan ja sille valitaan olemassa olevat laitteet laitetietokannasta.
Malli tuottaa paljon oheistietoa prosessista.
Laitetiedot voidaan koota prosessin teknilliseksi erittelyksi.
Tähän erittelyyn saadaan liitettyä kustannustiedot kustannustietopankista.
Varsinainen kustannusarvio voidaan muodostaa teknillisten erittelyiden tiivistelmänä.
Demonstraatiomalli on tehty Microsoft Excel -ohjelman avulla.
Siinä on mahdollista käyttää suunnittelukriteereinä sekä oletusarvoja että erikseen määriteltyjä arvoja.

Mallin kriittisin osa on kustannustietopankki.
Sen jatkuva päivittäminen on edellytys koko mallin luotettavuudelle.
Kustannustietoja on olemassa paljon, mutta tällä hetkellä ne eivät ole helposti käytettävissä.
Jotta mallista saataisiin mahdollisimman paljon hyötyä, on saman mallin oltava käytössä koko projektin ajan.
ED:2004-10-08
INSSI record number: 26381
+ add basket
« previous | next »
INSSI