Author:Savola, Pekka Heikki
Title:Porapaalujen käyttösovellukset pohjarakentamisessa
Applications of drilled piles in foundation engineering
Publication type:Master's thesis
Publication year:2004
Pages:102      Language:   fin
Department/School:Rakennus- ja ympäristötekniikan osasto
Main subject:Pohjarakennus ja maamekaniikka   (Rak-50)
Supervisor:Ravaska, Olli
Instructor:Viitala, Jouko
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:drilled piles
bearing capacity
pile toe
bond
porapaalu
kantavuus
paalun antura
tartunta
Abstract (eng): This thesis has been done for Lemcon Oy Infra:s department of foundation engineering.
Thesis was part of research and development work.
The developments of pile drilling methods and the increase in amount of equipment used in drilling have led to use of drilled piles in new applications in foundation engineering.
Various designs with drilled piles as part of structure have been introduced in this research to encourage the use of drilled piles in versatile applications.
Site testing was also made to combine drilled pile with jet grouted pile.
The objective was to increase the capacity of drilled steel pile with jet grouted pile toe.
The main task was to design and construct the bond of different pile types so that the capacities of both piles were fully utilized.

Two test piles were constructed at Lemcon Oy Infra:s construction site of Kasarmintori parking garage.
Test piles were tested with static load tests.
After loading both piles were excavated and inspected visually.
Testing was made using hydraulic jacks and test piles were in full scale.
Test pile was composed of drilled pile with length 6 m Ø219,1 mm and 3 m high Ø900 mm jet grouted pile.
The bond length between piles was 2 m.

The breaking load for comparison pile of Ø219,1 mm drilled steel pile in dense moraine ground was 700 kN.
Test pile with jet grouted pile toe didn't reach break.
Ultimate loading for test pile was 2 MN.
The capacity of drilled pile grew nearly three times with the use of jet grouted pile toe.
Also the settlements of pile were reduced compared to settlements observed during test loading of comparison pile.

After loadings the bond between drilled and jet grouted pile was taken apart and inspected visually and no signs of cracks or braking of material was found.
The capacity of bond was sufficient and the construction procedure was simple.
Phases of drilling procedure must be eliminated to carry method in applications.
Eliminating of drilling phases ensures also better quality for pile and for bond between components.
The capacity of test pile against breaking could not be reached.
Also the distribution of loading between tip and mantel could not be estimated.
Jet grouting is suitable method for constructing toe for drilled pile.
With jet grouted toe it is possible to reduce settlements and increase bearing capacity.
Abstract (fin): Tämä diplomityö on tehty Lemcon Oy Infran pohjarakennussegmentin tuotekehitystyön yhteydessä.
Porapaalujen käytön sekä asennukseen käytettävän kaluston lisääntymisen myötä on porapaaluja sovellettu myös uudenlaisiin pohjarakennusratkaisuihin.
Menetelmien käytön lisäämiseksi sekä porapaalujen monipuolisemman käytön edistämiseksi tässä työssä on esitelty toteutettuja kohteita, joissa on käytetty porapaaluja rakenteen osana.
Työssä on tutkittu myös porapaalujen soveltamista yhdistelmäpaalussa suihkuinjektoinnin kanssa.
Tavoitteena oli lisätä maakerrokseen tukeutuvan porapaalun kärkikantavuutta paalun alapäähän suihkuinjektointimenetelmällä tehdyn paalun anturan avulla.
Suurin haaste työssä oli teräsputkiporapaalun ja suihkuinjektointipilarin tartunnan mitoittaminen ja valmistaminen siten, että porapaalun ja suihkuinjektointipilarin kapasiteetit pystytään hyödyntämään kokonaan.

Työtä varten porattiin 2 kpl koepaaluja Lemcon Oy Infran Kasarmitorin pysäköintilaitoksen kaivantotyömaalla.
Koepaalut koekuormitettiin staattisilla koekuormituksilla, joiden jälkeen ne kaivettiin ylös ja tutkittiin silmämääräisesti.
Koekuormitus suoritettiin hydraulitunkeilla ja koejärjestelyt toteutettiin täysimittakaavaisina.
Koepaalu koostui 6 m pitkästä porapaalusta Ø219,1 mm sekä 3 m korkeasta Ø900 mm suihkuinjektointipilarista.
Porapaalun ja suihkuinjektointipilarin tartuntaosan pituus oli 2 m.

Vertailupaaluna olleen Ø219,1 mm porapaalun murtokuorma tiiviissä moreenikerroksessa oli 700 kN.
Suihkuinjektoidulla paalun anturalla varustettua koepaalua ei saatu koekuormituksissa murtotilaan.
Suurin koekuormitusvoima oli 2 MN.
Paalun kapasiteetti lähes kolminkertaistui suihkuinjektoidun paalun anturan myötä.
Lisäksi koepaalun painumat pienenivät merkittävästi vertailupaalun koekuormituksissa havaituista.

Silmämääräisissä tarkasteluissa suihkuinjektointipilarin ja teräsputkiporapaalun tartunnassa ei havaittu merkkejä murtumasta koekuormituksen jälkeen.
Tartunnan kapasiteetti riitti ja tartunnan tekeminen työteknisesti oli helppoa.
Porausvaiheita on kuitenkin vähennettävä yhdistelmäpaalun laajemman käytön varmistamiseksi.
Lisaksi porausvaiheiden vähentämisellä saavutetaan laadullisesti parempi lopputulos.
Koepaalun murtokapasiteettia ei saatu kokeen perusteella selville eikä kuormituksen jakautumista tartuntapinnan ja porapaalun kärkikantavuuden välillä.
Suihkuinjektoimalla on mahdollista tehdä toimiva paalun antura ja tällä voidaan kasvattaa paalun kapasiteettia sekä pienentää painumia.