search query: @keyword tuotantotieto / total: 2
reference: 1 / 2
« previous | next »
Author:Intke, Lauri
Title:Tuotantotieto tuotannonsuunnittelun pohjana
Production planning based on production data
Publication type:Master's thesis
Publication year:2009
Pages:69 (+6)      Language:   fin
Department/School:Koneenrakennustekniikan laitos
Main subject:Tuotantotekniikka   (Kon-15)
Supervisor:Aaltonen, Kalevi
Instructor:Pikkarainen, Antti
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:production planning
production data
scheduling model
tuotannonsuunnittelu
tuotantotieto
valmistussuunnitelmamalli
Abstract (eng):This master's thesis defines a process for utilizing production data in production planning. In this work it has been studied measuring and utilizing the production data including the challenges of the process. Target of the study is the order fulfilment process of electrical machines factory.

In production planning there is a need for master data that defines the load and scheduling of the production. ABB Oy Machines has the master data in a form of production models. In this work it has been described the process for maintaining the model library using the production data such as realizated lead times and working hours of working phases. The process is divided into phases that are introduced in detail. Target of the examination is the role of the production models in factory loading. It has been used statistical analyses for checking the reliability of the measuring results.

In this work it has been researched the phases of collecting the production data and applicability of the results for decision making in order fulfilment process. One of the targets of the study is usage of the reporting systems supporting the production planning. Maintaining the production models has an affect in the process, especially in designing and purchasing.

This work also makes a glance into order fulfilment processes of two other companies and the key factors of the heavy industry. Benchmarking has been made by interviewing people who are closely working with the processes.
Abstract (fin):Tämän diplomityön tavoitteena on muodostaa toimintamalli tuotantotiedon hyödyntämiselle tuotannonsuunnittelussa. Työssä on tutkittu tuotantotiedon keräämistä ja siihen liittyviä haasteita sekä tiedon hyödyntämisen kohteita tuotannonsuunnittelussa. Tutkimuksen kohteena on sähkökonetehtaan tilaus-toimitusprosessi.

Tuotannonsuunnittelussa tarvitaan pohjatietoa, jonka mukaan tuotannon kuormitus- ja ajoitustiedot määräytyvät. ABB Oy Sähkökoneissa pohjatietoa on valmistussuunnitelmamallien muodossa. Tässä työssä esitellään valmistussuunnitelmamallikirjaston ylläpitämiseen soveltuva prosessi, jossa käytetään hyväksi tuotannosta mitattavia tunnuslukuja, kuten toteutuneita työvaiheiden läpimenoaikoja ja työtunteja. Prosessi on jaettu vaiheisiin, jotka esitellään työssä yksityiskohtaisesti. Tarkastelun kohteena on valmistussuunnitelmamallien rooli tuotannon kuormituksessa. Tutkimuksessa on käytetty tilastollista analyysiä mittaustulosten luotettavuuden tarkasteluun.

Työssä tutkitaan tuotantotiedon keräämisen vaiheita sekä mittaustulosten soveltuvuutta päätöstentekoa helpottavana tekijänä tilaus-toimitusprosessissa. Tutkimuksen kohteena on myös raportointityökalujen käyttö tuotannonsuunnittelun tukena. Valmistussuunnitelmamallien ylläpidon myötä tulevien muutosten vaikutuksia on tarkasteltu ottaen huomioon suunnittelun ja hankinnan prosessit.

Työssä on myös luotu katsaus kahden muun yrityksen tilaus-toimitusprosessiin ja vertailtu toiminnan avaintekijöitä. Yritysvertailu on suoritettu haastattelemalla yrityksen tilaus- toimitus-prosessin hyvin tuntevia henkilöitä.
ED:2010-02-02
INSSI record number: 38843
+ add basket
« previous | next »
INSSI