search query: @author Pulkkinen, Ilari / total: 2
reference: 1 / 2
« previous | next »
Author: | Pulkkinen, Ilari |
Title: | Unifying the Process for Requirements Engineering in Multi-site Organizations: A Case Study with Interface Development Tools |
Vaatimusmäärittelyprosessin yhtenäistäminen hajautetussa organisaatiossa: Tapaustutkimus käyttöliittymäkehitystyökaluilla | |
Publication type: | Master's thesis |
Publication year: | 2011 |
Pages: | [7] + 94 s. + liitt. 4 Language: eng |
Department/School: | Tietotekniikan laitos |
Main subject: | Käytettävyystutkimus (T-121) |
Supervisor: | Nieminen, Marko |
Instructor: | Luotojärvi, Mika |
Electronic version URL: | http://urn.fi/URN:NBN:fi:aalto-201207022759 |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark Aalto 1316 | Archive |
Keywords: | requirements user interface development tool workshop process automation multi-site organizations vaatimukset käyttöliittymäkehitystyökalu workshop prosessiautomaatio hajautetut organisaatiot |
Abstract (eng): | Requirements gathering is challenging as it is but it becomes even more challenging when it is done in a multi-site organization consisting of several business units having their own specialized needs. This work is based on a requirements gathering project done for CPM (Collaborative Production Management) -technology R&D unit of ABB Process Automation Division. The goal of this project was to find out if it is possible to unify CPM user interface development efforts throughout all the business units of ABB Process Automation Division. The goal of this work on the other hand was to form a process that could answer several challenges in requirements gathering. In the beginning of the work challenges for requirements gathering presented in literature are covered. After that a process is presented that was developed and used in the requirements gathering project. In the end there is an analysis about how the presented process met the challenges presented in the beginning of the work. The results reveal several critical factors about how the process helps to manage large amounts of highly diverse requirements and gather them efficiently. The used mind map framework and prioritization scheme help to cope with the diversity. Furthermore the context specific brainstorming workshops and ULCR (User-led Construction of Requirements) -methodology result in correct and relevant requirements. And finally the moderator control and having domain experts in the team ensure efficient workshops. |
Abstract (fin): | Vaatimusmäärittelyn tekeminen on haastavaa jo sinänsä, mutta siitä tulee vielä haastavampaa, kun se tehdään hajautetussa organisaatiossa koostuen useista eri liiketoimintayksiköstä joilla jokaisella on omat erityistarpeensa. Tämä työ perustuu vaatimusmäärittelyjenkeräämisprojektiin, joka tehtiin ABB:n Prosessiautomaatiodivisioonan CPM (Collaborative Production Management ) -teknologian T&K -yksikölle. Tämän projektin tavoitteena oli selvittää, miten voidaan yhtenäistää CPM -käyttöliittymäkehitystoimintaa ABB:n prosessiautomaatio-liiketoimintayksikössä. Toisaalta tämän työn tavoite oli muodostaa prosessi, joka vastaa useisiin vaatimusmäärittelyjen keräämiseen liittyviin haasteisiin hajautetuissa organisaatioissa. Työn alussa on kirjallisuuskatsaus, jossa esitellään haasteita vaatimusmäärittelyjen keräämiselle. Sen jälkeen esitellään prosessi, joka kehitettiin ja jota käytettiin vaatimusmäärittelyjen keräämisprojektissa. Lopussa analysoidaan, kuinka esitetty prosessi vastasi alussa esitettyihin haasteisiin. Tulokset paljastavat useita kriittisiä tekijöitä miksi valittu prosessi auttaa hallitsemaan suurta määrää hyvin erilaisia vaatimuksia, sekä keräämään ne tehokkaasti. Käytetty miellekarttakehys, sekä priorisointijärjestelmä auttavat käsittelemään erilaisia vaatimuksia. Lisäksi kontekstispesifiset aivoriihityöpajat, sekä ULCR (User-led Construction of Requirements) -metodiikka johtavat oikeisiin ja oleellisiin vaatimuksiin. Sen lisäksi moderaattorien kontrolli, sekä domain-asiantuntijoiden mukanaolo tiimissä takaavat tehokkaan työpajatyöskentelyn. |
ED: | 2012-02-16 |
INSSI record number: 43948
+ add basket
« previous | next »
INSSI