Author:Vainionpää, Jussi
Title:Sähkölevyvalmistuksen läpimenoajan lyhentäminen
Reducing the motor lamination manufacturing through-put time
Publication type:Master's thesis
Publication year:2013
Pages:118 + [17]      Language:   fin
Department/School:Koneenrakennustekniikan laitos
Main subject:Tuotantotekniikka   (Kon-15)
Supervisor:Niemi, Esko
Instructor:Alamartimo, Pertti
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:production control
through-put time
batch size
set-ups
capacity
tuotannonohjaus
läpimenoaika
eräkoko
asetukset
kapasiteetti
Abstract (eng):This thesis considers stator and rotor sheet manufacturing production control in electric motor manufacturing. The background of the thesis was the desire to find better control models for production in order to achieve better throughput time and on-time reliability. Sheet manufacturing is a part of the stator and rotor manufacturing chain, the completion of which is often the determinative factor in the starting time of the motor assembly. In addition, the subsequent motor manufacturing steps benefit from increased share of one-time deliveries.

During this research, the elements affecting the production lead-time are analysed and possible improvements to control the sheet manufacturing for minimised lead-time are presented. In addition, the aim was to find the most effective inventory control models for inventory-controlled production in order to achieve good service level and simultaneously keeping inventory value low. The work was limited to production control, for example technical aspects of tooling were left out of this thesis. In addition, work was limited to only deal with lamination manufacturing activities, other activities of the plant were excluded.

It can be concluded that the delivery time and on-time reliability for make-to-order sheet items are mostly affected by the job queuing time. Waiting time is the sum of the jobs in queue and their duration. Work queue length for the batches is affected by the amount of variation, as well as the overall load level. The factory specialises in the manufacture of special types of motors, which results in a large number of different winding options, and consequently, a large number of different types of stator and rotor sheets. Requirements for the different types of sheet types vary depending on the order backlog of motors. Variability in sheet requirements result in variation of work queue length, which from time to time exceeds the time allocated for the sheet manufacturing.

Recommendations and suggestions for reduced lead-time for make-to-order items are concentrated on the actions to minimise queuing time. The average queuing time can be affected by reducing the peaks of work load, either by reducing the total load, or by load levelling. The load levelling can be done by making suitable types of sheets to stock during lower load levels. During higher loads the demand of these types of sheets can be satisfied from stock. To reduce the overall load-level for single notching, some make-to-stock items can be transferred to be manufactured using compound tools and presses.
Abstract (fin):Tässä opinnäytetyössä käsitellään sähkömoottoritehtaan sähkölevyvalmistuksen tuotannonohjausta. Taustalla oli halu löytää parempia ohjausmalleja tuotannonohjaukseen paremman läpimenoajan ja toimitusvarmuuden saavuttamiseksi. Levyvalmistus on osa moottorin staattorin ja roottorin tuotantoketjua, joiden valmistuminen on usein määräävä tekijä määritettäessä moottorin kokoonpanon aloitushetkeä. Lisäksi levyvalmistuksen toimitusvarmuutta, eli ajallaan valmistuneiden levyerien osuutta kasvattamalla myös muu tehtaan tuotanto hyötyy täsmällisemmistä toimituksista seuraavaan vaiheeseen.

Työn aikana etsittiin mahdollisia parannuskeinoja sähkölevytuotannon ohjaamiseen siten, että tuotannon läpimenoajasta muodostuisi mahdollisimman lyhyt. Lisäksi tavoitteena oli hakea varasto-ohjatulle tuotannolle mahdollisimman tehokkaat ohjausmallit, jotta varaston palvelutaso olisi mahdollisimman hyvä, mutta toisaalta varaston arvo ei nousisi liian suureksi. Työ rajattiin koskemaan tuotannonohjauksen kehittämistä, joten esimerkiksi työkaluteknisten seikkojen käsittely jätettiin työn ulkopuolelle. Lisäksi työ rajattiin käsittelemään pelkästään urittamon toimintaa, eikä muun tehtaan toimintaan puututtu.

Johtopäätöksinä voidaan todeta, että tilausohjattujen levyerien toimitusaikaan, ja -varmuuteen vaikuttaa eniten työn jonotusaika. Jonotusaika muodostuu työjonossa odottavien töiden määrästä ja kestosta. Työjonojen pituuteen vaikuttavat uritustöiden määrän vaihtelu, sekä yleinen kuormitustaso. Tehtaan erikoistuminen erikoisimpien moottorityyppien valmistamiseen tuo mukanaan erilaisten käämitysvaihtoehtojen suuren määrän ja tämän myötä suuren määrän erilaisia sähkölevytyyppejä. Erilaisten sähkölevytyyppien tarve vaihtelee kulloisenkin moottoreiden tilauskannan mukaan. Vaihteleva levytarve näkyy sähkölevynvalmistuksen työjonojen pituuden vaihteluna. Ajoittain työjonojen pituus ylittää levyerän valmistukseen varatun ajan, jolloin levyerän valmistuminen myöhästyy.

Suosituksiksi ja kehitysehdotuksiksi läpimenoajan vähentämiseksi kehitettiin työn jonotusaikaan vaikuttavia keinoja. Jonotusaikaan voidaan vaikuttaa vähentämällä kuormituspiikkejä joko kokonaiskuormitusta keventämällä, tai kuormaa tasaamalla. Kuormaa voidaan tasata valmistamalla sopivia levytyyppejä varastoon alhaisen kuormituksen aikana. Korkean kuormituksen aikana naiden levytyyppien kysyntään voidaan vastata varastojen avulla. Kuormitusta voidaan keventää varasto-ohjattujen levytyyppien siirrolla yhteisuritukseen, jolloin tilausohjatun tuotannon ei tarvitse odottaa varastontäydennyksien aikana.
ED:2013-10-21