search query: @keyword nosturi / total: 26
reference: 19 / 26
« previous | next »
Author:Gylling, Thomas
Title:Life Cycle Cost modelling for Electric Overhead Travelling cranes
Livscykelkostnadsmodell för traverskranar
Elinjaksokustannusmallintaminen siltanosturille
Publication type:Master's thesis
Publication year:2004
Pages:91+9      Language:   eng
Department/School:Konetekniikan osasto
Main subject:Teollisuustalous   (TU-22)
Supervisor:Lillrank, Paul
Instructor:Paasikivi, Nelli
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  6365   | Archive
Keywords:life cycle cost
LCC
cranes
cost per performance
elinjaksokustannus
LCC
nosturi
libscykelkostnad
kranar
Abstract (eng): Life Cycle Cost LCC covers all costs that occur for a product during its whole life cycle.
The goal of this thesis was to build a practical LCC model for Electric Overhead Travelling EOT cranes, and test the model with analyses in a pilot.
As a higher goal was to use the results of LCC analyses to determine a cost for a lifting service, a so-called cost per performance.
This lifting service should include all cost associated with the crane.

During the study, a LCC model was build and put to trial in a pilot were analyses for two EOT cranes in heavy process usage in the steel industry were made.
An old manually operated crane as well as a new, automatic crane were analysed and compared.
The necessary data and sources for the analyses were collected to a LCC "Quick Start" table with the intention of helping the making of similar analyses in the future.

The results showed that the old, manual crane was a lot more costly than the newer automatic crane.
The cranes were compared for a period of four years.
Under this focused observation period the older crane had generated four times more total LCC and over twice as much maintenance costs as the newer crane.

The cost of the lifting service was defined in euro per produced ton steel, and was for the older crane 0.69 € per ton and for the new crane 0.57 € per ton with the present settings.
The sensitivity analysis showed that when altering the input factor with the highest influence with +/-10%, the results varied with +/-4.6%.
This uncertainty was considered acceptable.

A suggestion was finally made how to charge the pricing of the service, which compared it with the electricity charging of households in Finland.
Abstract (fin): Tuotteen elinjaksokustannukset kattavat kaikki elinjakson aikana syntyvät kustannukset.
Tämän työn tavoitteena oli rakentaa käytännöllinen elinjaksokustannusmalli siltanosturille, sekä kokeilla mallin toimivuutta pilotissa.
Työn korkeampi tavoite oli käyttäen analyysin antamia arvoja määrittää kustannus nostopalvelulle.
Tähän nostopalveluun tulisi sisältyä kaikki nosturiin liittyvät kustannukset.

Tutkimuksen aikana elinjaksokustannusmalli rakennettiin ja sitä kokeiltiin terästeollisuudessa kovassa prosessikäytössä olevaan kahteen siltanosturiin.
Toinen nosturi oli vanha ja manuaaliohjattu ja toinen oli uudempi automaattinosturi.
Nämä analysoitiin ja vertailtiin keskenään.
Analyysiin tarvittava tieto sekä tiedon lähteet koottiin yhteen taulukkoon, jonka tarkoituksena oli auttaa tulevien vastaavanlaisten analyysien tekoa.

Tulokset osoittivat että vanha manuaalinosturi oli paljon kalliimpi verrattuna uudempaan automaattinosturiin.
Nosturit vertailtiin neljän vuoden tarkastelujakson aikana.
Tämän katsastelun aikana vanha nosturi oli aiheuttanut neljä kertaa enemmän kokonaiskustannuksia kuin uudempi, sekä melkein kaksi kertaa enemmän huoltokustannuksia.

Nostopalvelun kustannus annettiin euroissa nostettua terästuotantotonnia kohti.
Kustannus saatiin vanhalle nosturille 0,69 € tuotantotonnia kohti nykyisillä asetuksilla.
Uudemmalle nosturille kustannukseksi kertyi 0,57 € tuotantotonnia kohti.
Herkkyysanalyysi osoitti että muuttamalla vaikuttavinta tekijää +/-10 %, lopputulos vaihteli +/-4,6 %.
Tätä epävarmuutta pidettiin hyväksyttävänä.

Lopuksi tehtiin ehdotus hinnoittelusta, jonka mukaan nostopalveluista velotettaisiin Suomen sähkölaskujen perimistavan mukaan.