Author:Heinämäki, Mauri
Title:Sähkökonetehtaan rakennusprojekti Kiinassa
Electrical machine factory project in China
Publication type:Master's thesis
Publication year:2010
Pages:61 + [4]      Language:   fin
Department/School:Elektroniikan, tietoliikenteen ja automaation tiedekunta
Main subject:Sähkömekaniikka   (S-17)
Supervisor:Arkkio, Antero
Instructor:Laamanen, Antti
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  786   | Archive
Keywords:project
design
electrical machine
factory
production control
projekti
suunnittelu
sähkökone
tehdas
tuotannonohjaus
Abstract (eng): This Master's Thesis is made for ABB Group's local business unit Machines.
The objective of this thesis was to project, build and start up new electrical machine factory in Lingang, Shanghai, China.

Factory building project is a big completeness, which contains overall design, different permits, construction and supervising that, handover and commissioning of the building.
In this size of the a project ABB is always using so called Gate-model that support well decision making and gives an organized method to run a big project.
Starting point for a design are the products that will be produced and demands that they set for the building, lead times for manufacturing, production equipment and needed time and space for manufacturing.
Result will be the layout which is the starting point for a detailed design.

Because it is a new factory building, layout can be designed to support natural production flow.
To support this production control model is needed.
Model is depended on the manufactured products and the lead time of products.

As a result of thesis we got a working factory, but final results will be seen years from now.
To ramp-up the factory takes a long time and sometimes it is also painful.
Work itself doesn't end here.
It is a continuing process to get the lead time of the product shorter and production costs down.
Abstract (fin): Tämä diplomityö on tehty ABB Oy:n Sähkökoneet -liiketoimintayksikölle.
Työn tavoitteena oli projektoida, rakentaa ja käynnistää uusi sähkökonetehdas Kiinan Shanghaihin Lingangin esikaupunkialueelle.

Tehtaan rakennusprojekti on laaja kokonaisuus, johon kuuluu kokonaissuunnittelu, lupakäytännöt, rakennustyöt sekä töiden valvonta, vastaanotto ja käyttöönotto.
Tämän kokoluokan projektiin käytetään ABB:lla ns.
Gate-mallia, joka tukee hyvin päätöksentekoa ja antaa organisoidun rakenteen isolle projektille.
Suunnittelun lähtökohtana ovat valmistettavat tuotteet ja niiden asettamat vaatimukset rakennukselle, tuotteiden läpimenoajat, prosessin vaatimat tuotantolaitteet ja valmistukseen tarvittava aika ja tila.
Näistä tuloksena saadaan tehtaan pohjapiirustus, joka on rakennusteknisen suunnittelun pohjana.

Koska tehdasrakennus on uusi, voidaan pohjapiirustus suunnitella tukemaan mahdollisimman hyvin tuotannon luonnollista virtausta.
Tätä tukemaan tarvittiin tuotannonohjausmalli, jolla tuotantoa ohjataan.
Malli on riippuvainen valmistettavista tuotteista ja niiden läpimenoajoista.

Työn tuloksena saatiin toimiva tehdas, jonka lopulliset tulokset nähdään vuosien päästä.
Tuotannon ylösajoon tarvittava aika on pitkä ja välillä myös tuskallinen.
Työ tuotannon järkeistämiseksi ei lopu tähän vaan se on jatkuva prosessi saada läpimenoaikaa pienemmäksi ja kustannuksia alemmaksi.