search query: @instructor Reinikainen, Ville / total: 4
reference: 3 / 4
« previous | next »
Author:Sinisalo, Jani
Title:Tietomallipohjaisen energia-analyysin mahdollisuudet LVI-suunnittelussa
The usage of BIM based energy analysis in HVAC design
Publication type:Master's thesis
Publication year:2012
Pages:63 s. + liitt.      Language:   fin
Department/School:Energiatekniikan laitos
Main subject:LVI-tekniikka   (Ene-58)
Supervisor:Sirén, Kai
Instructor:Reinikainen, Ville
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  5408   | Archive
Abstract (eng): The aim of this work was to develop and define the affordance of BIM (building information model) based energy analysis in HVAC design from the beginning of the project.
In addition, with the Riuska energy analysis program developed by Granlund Oy an example calculations of a pilot project were to be made.

In the literary report the current situation of BIM based energy analysis in building services was researched.
The area of focus was in HVAC design.
The basics usage of building information models in design was scrutinized and the utilization possibilities researched.
In addition, seven (7) different energy simulation programs were studied, focusing on two programs that fulfil the requirements of the new building regulations (Riuska and IDA Ice).
The new building regulations' requirements and effects to the BIM based design are presented.
A vital result was the creation of a model for the report, which concentrated on the optimizing and increasing of the usage of the energy analyses in the early and final stages of a project.
The model has been used in Rym Model Nova and ISES-projects, in which Granlund has been cooperating as one participant.

For a pilot project a comparison calculations with four different HVAC design solutions were made and analysed according to the customers' needs.

It was observed that the usage of BIM based energy analyses should be optimized and it is important that energy analyses are used through the whole life cycle of a project, in the early design phase as well as in the maintenance stage, because the early design and the maintenance stage are the most potential stages to affect the energy consumption of the building during its lifespan.
A process flow chart was made that demonstrates the iterative process, which shows how the choice that fulfils the requirements of the customers' needs and the building regulations is made from the different solutions in the early design phase.
The monitoring and analysing of the energy efficiency of the building during the maintenance phase should be systematically used to achieve the most optimal situation of the real energy consumptions.
With the help of the BIM the most effective way of usage can be achieved during the maintenance stage.

The calculations were made with Riuska program developed by Granlund Oy.
The results show the importance of the system with air flow adjustment in ventilation.
The usage of air flow adjustment system is preferred when possible, because it significantly reduces the heating and cooling needs as well as the electricity consumption.
Abstract (fin): Työn tavoitteena oli kehittää ja selvittää tietomallipohjaisen energia-analyysin käyttömahdollisuuksia LVI-suunnittelussa hankkeen alusta asti, tehostaen alkuvaiheen suunnittelua.
Lisäksi työn osatavoitteena oli suorittaa ja analysoida Granlund Oy:n Riuska energia-analyysiohjelmalla esimerkkilaskenta pilottikohteesta.

Kirjallisuustutkimuksessa selvitettiin tietomallipohjaisen energia-analyysin tämän hetkisiä hyödyntämisen mahdollisuuksia ja ongelmia talotekniikan osalta.
Painopistealueena tässä tarkastelussa oli LVI-suunnittelu.
Työssä käytiin läpi tietomallintamisen periaatteet ja selvitettiin sen hyödyntämismahdollisuuksia suunnittelussa.
Työssä myös selvitettiin seitsemän (7) eri energiasimulointiohjelmistojen toimintaperiaate, keskittyen kahteen, uudet rakentamismääräyskokoelman vaatimukset selkeästi täyttävään ohjelmaan (Riuska ja IDA Ice).
Uusien rakentamismääräyksien vaatimukset ja vaikutukset tietomallipohjaiseen suunnitteluun on myös esitetty työssä.
Työssä keskeisenä tuloksena kehitettiin mallia, jonka avulla energia-analyysien käyttöä voitaisiin tehostaa ja lisätä hankkeen alku- sekä loppuvaiheessa.
Toteutettua mallia on käytetty hyväksi myös Rym Model Nova sekä ISES-projekteissa, joissa Granlund on toiminut yhtenä osapuolena.

Pilottikohteelle tehtiin neljällä eri taloteknisellä ratkaisulla vertailulaskelmat ja analysoitiin asiakkaan tarpeiden mukaisesti.

Tutkimuksessa havaittiin, että tietomallipohjaisen energia-analyysin käyttöä tulisi tehostaa ja on tärkeää, että energia-analysointeja hyödynnetään hankkeen elinkaaren kaikissa vaiheissa.
Energia-analysointeja tulisi tehdä niin alkuvaiheen suunnittelussa kuin käytönaikaisessa kohteen energiataloudellisen toiminnan varmistuksessa, sillä alkuvaiheen suunnittelu ja käytön aikainen vaihe ovat rakennuksen elinkaaren aikana potentiaalisimmat vaiheet vaikuttaa rakennuksen energiankulutukseen.
Työtä varten luotiin prosessikaavio, jolla havainnollistettiin iteratiivinen prosessi, jolla alkuvaiheen suunnittelun eri vaihtoehdoista valitaan asiakkaan tavoitteet ja rakentamismääräysten vaatimukset täyttävä toimiva ratkaisu.
Myös rakennuksen käytön aikaista energiatehokkuuden valvontaa ja analysointia tulisi järjestelmällisesti käyttää hyväksi, jotta toteutuneet energiankulutukset saadaan lähemmäksi optimitilannetta.
Tietomallia voidaan käyttää hyväksi käytönaikaisessa vaiheessa tehokkaan ylläpidon tukena.

Laskentatapaus tehtiin Granlund Oy:n Riuska-ohjelmalla.
Laskentatulokset osoittavat ilmavirtasäätöisen järjestelmän tärkeyden ilmanvaihdossa.
Ilmavirtasäätöisen järjestelmän käyttö on suositeltavaa aina kun mahdollista, sillä se alentaa merkittävästi lämmitys-, jäähdytystehon tarvetta sekä sähkön kulutusta.
ED:2012-12-03
INSSI record number: 45664
+ add basket
« previous | next »
INSSI