search query: @keyword earned value / total: 4
reference: 1 / 4
« previous | next »
Author:Hooli, Tapani
Title:Progress measurement of an automation design project
Automaatiosuunnitteluprojektin edistymän seuranta
Publication type:Master's thesis
Publication year:2013
Pages:vii + 89 s. + liitt. 3      Language:   eng
Department/School:Kemian tekniikan korkeakoulu
Main subject:Prosessit ja tuotteet   (KE3003)
Supervisor:Jämsä-Jounela, Sirkka-Liisa
Instructor:Markkanen, Mikko
Electronic version URL: http://urn.fi/URN:NBN:fi:aalto-201311157847
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto  2124   | Archive
Keywords:progress measurement
automation project
earned value
work breakdown structure
edistymänseuranta
automaatiosuunnitteluprojekti
Abstract (eng):The aim of an automation design project is to produce a factory automation system, including procedures for use and maintenance.
An automation design project is always unique as is its product, an automation system.

The purpose of this work is to study how to measure the progress of an automation design project.
The thesis begins by describing a project in general, next an automation project and finally the project progress measurement methods.

To study an automation design project, the work breakdown structure (WBS) must be formed.
The WBS is a tree like model and it divides a project into smaller parts called work packages (WP).
Using the work packages the progress of the project can be followed.
The work packages contain tasks and activities that result in deliverables such as documents and data.
In this thesis, the indicators are selected for measuring the progress and finally guidelines are given how these indicators should be used to measure the progress of the automation design project.
Abstract (fin):Työn tarkoituksena on selvittää, miten automaatiosuunnitteluprojektin edistymää seurataan.
Työn pohjana käytetään yleisiä projektin edistymän seurantatapoja ja pyritään soveltamaan näitä automaatiosuunnitteluprojektiin.

Automaatiosuunnitteluprojektin ideana on tuottaa tehtaalle sen automaatiojärjestelmä.
Lisäksi projektissa tuotetaan tieto siitä, kuinka järjestelmää käytetään ja kuinka sitä ylläpidetään.
Tuotettu automaatiojärjestelmä on aina yksilöllinen jokaiselle projektille ja tehtaalle.

Jotta automaatiosuunnitteluprojektin edistymää voidaan seurata, on sen työnositus (eng.
Work breakdown structure, WBS) muodostettava.
Työnositus on puumalli, joka jakaa projektin pieniin osiin, työpaketteihin (eng.
Work packet, WP).
Työpaketteja seuraamalla voidaan projektin etenemistä seurata.

Työpaketit ovat automaatiosuunnitteluprojektissa dokumentteja ja suunnittelujärjestelmän tietokannan dataa.
Tässä työssä perehdytään siihen, mitkä ovat oikeat mittarit mittaamaan automaatiosuunnittelunprojektin edistymää.
Lopuksi esitellään, kuinka valittuja mittareita voidaan hyödyntää projektin edistymän seurannassa.
ED:2013-12-02
INSSI record number: 48116
+ add basket
« previous | next »
INSSI