search query: @keyword capacity / total: 49
reference: 26 / 49
Author: | Akkanen, Tuomas |
Title: | Optimization of manufacturing process of gear housing in new gear factory in P.R. China |
Hammasvaihteen kotelon valmistusprosessin optimointi uudessa hammasvaihdetehtaassa Kiinan Kansantasavallassa | |
Publication type: | Master's thesis |
Publication year: | 2004 |
Pages: | x + 81 s. + liitt. 10 Language: eng |
Department/School: | Konetekniikan osasto |
Main subject: | Konepajatekniikka (Kon-15) |
Supervisor: | Aaltonen, Kalevi |
Instructor: | Ainali, Jari |
OEVS: | Electronic archive copy is available via Aalto Thesis Database.
Instructions Reading digital theses in the closed network of the Aalto University Harald Herlin Learning CentreIn the closed network of Learning Centre you can read digital and digitized theses not available in the open network. The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/ You can read theses on the Learning Centre customer computers, which are available on all floors.
Logging on to the customer computers
Opening a thesis
Reading the thesis
Printing the thesis
|
Location: | P1 Ark TKK 2758 | Archive |
Keywords: | layout capacity machine tool investment production planning control scheduling |
ED: | 2005-01-12 |
INSSI record number: 26636
+ add basket
INSSI