search query: @keyword information modeling / total: 6
reference: 3 / 6
« previous | next »
Author:Baarman, Jim
Title:Tietomallintamisen hyödyt ja haasteet teollisuusrakennesuunnittelun näkökulmasta
Benefits and challenges using building information modeling in industrial structural design
Publication type:Master's thesis
Publication year:2013
Pages:94 + [6]      Language:   fin
Department/School:Rakennustekniikan laitos
Main subject:Rakentamistalous   (Rak-63)
Supervisor:Saari, Arto
Instructor:Laihanen, Tuomas
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:BIM
industrial construction
information modeling
BIM
teollisuusrakentaminen
tietomallintaminen
Abstract (eng): While automation, information systems, improved supply chain management systems and collaboration tools have improved the productivity for most industries since the 1960'S, the productivity of the construction industry remains relatively unchanged.
Globally, there are high expectations of Building Information Modelling, BIM.
BIM is hoped to enhance the design process, while improving overall construction quality and productivity.

Fast execution schedule, lack of sufficient initial data and constant changes are specific for industrial construction projects.
In addition, there are usually more participants involved than in conventional residential and commercial construction projects, which causes further challenges both in establishing limits for responsibilities and coordinating and controlling the planning process.
The architect's role is generally limited, while the plant and structural engineers' involvement increases.

The implementation of BIM hasn't occurred evenly.
Noticeable differences can be found when comparing the usage of BIM both within and between different design disciplines.
The main benefit of BIM technology is the possibility to integrate different models and detect clashes and errors between them.
The feature is especially useful in large scale and demanding construction projects, which industrial projects often are.
BIM can substantially improve the quality of construction plans and the overall information exchange between project participants.
The BIM tools still need further development, but many of the challenges faced today derive from the fact that the environments, processes and methods aren't adapted for the new tools.

Even though the information exchange between individual programs has reached a moderate level, the co-operation between the participants involved is still a challenge.
In addition, industrial construction projects face greater interoperability issues than typical residential and commercial building projects.
While most AEC software recognizes the IFC-exchange format, it's rarely supported by process designing software.
Abstract (fin): Rakennusteollisuuden tuottavuuskehitys on pysynyt lähes ennallaan muiden teollisuudenalojen onnistuttua hyödyntämään automatisointia, tietojärjestelmiä, parantuneita toimitusketjujen hallintajärjestelmiä ja yhteistyövälineitä tehokkuuden parantamiseksi.
Tietomallinnukseen kohdistuu maailmanlaajuisesti suuria odotuksia.
Sen toivotaan tehostavan suunnitteluprosessia samalla, kun rakentamisen laatu ja tuottavuus parantuisi.

Nopea toteutusaikataulu, lähtötietojen puutteellisuus ja jatkuvat muutokset ovat ominaisia teollisuushankkeelle.
Verrattuna tavanomaiseen hankkeeseen suunnitteluryhmän suuri koko aiheuttaa lisähaasteita sekä vastuurajojen selvittämiselle että suunnitteluprosessin koordinoimiselle ja ohjaukselle.
Arkkitehdin työnkuva on yleensä niukka, tärkeimpinä osapuolina ovat laitos- ja rakennesuunnittelu.

Tietomallintamisen käyttöönottaminen ei ole tapahtunut tasaisesti.
Vaihtelua esiintyy sekä suunnitteluosapuolten välillä että niiden sisällä.
Tietomallintamisen tärkeimmät hyödyt ovat sen mahdollistama tietomallien yhteensovittaminen törmäystarkasteluineen, josta olisi hyötyä etenkin laajoissa ja vaativissa rakennushankkeissa, jollaisia teollisuushankkeet monesti ovat.
Tietomallintamisella voidaan oleellisesti parantaa suunnitelmien laatua ja hankkeen tiedonkulkua.
Työkalut vaativat edelleen kehittämistä, mutta monet tämän päivän haasteista johtuvat ennemminkin siitä, että ympäristöjä ja toimintatapoja ei ole kehitelty ja viimeistelty tarpeeksi.

Yksittäisten ohjelmien välillä tietoa pystytään jo siirtämään kohtuullisesti, mutta yhteistyö kaikkien osapuolten välillä on edelleen suuri haaste.
Teollisuushankkeissa ongelmaksi muodostuu myös se, että vaikka IFC-formaatti on hyväksi todettu rajapinta asuin- ja toimitilarakentamisessa, se on tuntematon useimmille prosessisuunnitteluohjelmille.
ED:2013-09-30
INSSI record number: 47283
+ add basket
« previous | next »
INSSI